首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
admin
2012-09-19
61
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs.
According to the passage, all of the following are sources of radioactive waste EXCEPT ______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
第三段的开头提到了废料的来源有Power plants and bomb-making,另外还有Uranium mining and milling operations,显然没有提到B项的内容。该题属于细节辨析题。
转载请注明原文地址:https://kaotiyun.com/show/zS57777K
0
大学英语四级
相关试题推荐
Withoutthattemporaryworking-site,thestudent__________(不可能按时完成设计).
ThoughtsofsuicidehauntedAnitaRutnamlongbeforeshearrivedatSyracuseUniversity.Shehadahistoryofmentalillnessand
Haveyoueverwonderedwhatourfutureislike?Practicallyallpeople【C1】______adesiretopredicttheirfuture【C2】______People
A、TogototheHonorssection.B、Tohearhissuggestionsforgraduateschools.C、Totakehisphilosophycourse.D、Toaskabouth
Whenanti-globalizationprotesterstooktothestreetsofWashingtonlastweekend,theyblamedglobalizationforeverythingfrom
Theviewoveravalleyofatinyvillagewiththatched(草盖的)roofcottagesaroundachurch;adrivethroughanarrowvillagestree
Theheatingsystemhasrecentlybeen______tomakeitmoreefficient.
Forthispart,youareallowed.30minutestowriteacompositiononthetopic:HowtoKeepPsychologicallyHealthy.Youshould
A、50minutes.B、60minutes.C、10minutes.D、15minutes.CDavid说他基本上每天都是8:50到办公室,而他公司每天9点正式上班,故选C
随机试题
患者,男性,25岁。体重60kg。不慎被开水烫伤,自觉剧痛,头面部、颈部及双上肢均为水疱。对该患者实施补液治疗,其中电解质溶液首选
某泵站工程,业主与总承包商、监理单位分别签订了施工合同、监理合同。总承包商经业主同意将土方开挖、设备安装与防渗工程分别分包给专业性公司,并签订了分包合同。施工合同中说明:施工工期278天,2004年9月1日开工,工程造价4357万元。合
江西境内30多个县市有客人分布,其主要聚居地区是()。
优抚安置社会工作是新时代中国特色强军之路的组成部分,其服务对象特点鲜明,主要包括()
(1)分析数据(2)分析问题,制定实验方案(3)实验,得出数据(4)得出结论,解决问题(5)发现问题
下列不属于公安治安行政处置权中许可权力行为一项是()。
在关系模型中,若属性A是关系R的主码,则在R的任何元组中,属性A的取值都不允许为空,这种约束称为______规则。
有以下程序#include<stdio.h>main(){inti,sum;for(i=1;i<6;i++)sum+=i;printf("%d\n",sum);
TheAmericanpoliceweretryingto______downthecriminalinasmalltowninMexico.
我们都知道农村是艰苦的。
最新回复
(
0
)