首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
High-speed Rail on Track If an agreement signed in Germany works out, travellers of this Asian city may one day be able to z
High-speed Rail on Track If an agreement signed in Germany works out, travellers of this Asian city may one day be able to z
admin
2012-07-29
91
问题
High-speed Rail on Track
If an agreement signed in Germany works out, travellers of this Asian city may one day be able to zip from the downtown area to its new airport on a train riding a stream of magnetic energy at speeds up to 500 kilometres per hour.
The 40-kilometres-trip—now sometimes a long hour journey when the traffic is heavy— could be cut to less than 10 minutes.
Such are the goals of a costly project designed to help to "shorten"the distance between the city centre and the suburban busy airport by making it easier and faster to carry travellers to and back from the airport.
The mayor of the city and Germany’s Thyssen Krupp AG worked out an agreement in Berlin only several days ago that lays the groundwork for the magnetic levitation train line. They signed a commitment to carry out a feasibility study on the project and outlined the city’s intention to import German technology. This project, once completed and acceptable to the two business parties, will be a double-win: the German company can benefit from exporting its technology and equipment and the city receiving German technology can improve its traffic and further strengthen its position as a cosmopolis.
Called Maglev for short, the system under discussion makes use of a high-speed train levitated above a guideway and propelled by magnetic fields. The project has been in the talking stage for several months.
Hans Ueberschaer, German’s ambassador visited the city together with Harmut Heine, representative of Thyssen Krupp. They had an initial discussion with the mayor there about the prospect of the project. The talks were believed to be constructive and paved the way for the future talks in Berlin, where a commitment was reached.
Sources familiar with the talks estimated that the project would cost US$723 million, which would cover everything from land use fees and rail construction to train cars. Completion date is 2005. A joint venture company is to be established for the project.
What is the main feature of Maglev?______
选项
A、The Maglev train"floats"above the guideway and zip to its destination.
B、The Maglev train zips to its destination on the railway.
C、The Maglev train zips to its destination on a double guideway.
D、The Maglev train can carry more passengers than the electric train.
答案
A
解析
答案的依据可在第五段找到。Maglev的关键是火车悬浮在导轨上飞速运行,所以只有选项A是正确答案。
转载请注明原文地址:https://kaotiyun.com/show/zhmd777K
本试题收录于:
职称英语卫生类B级题库职称英语分类
0
职称英语卫生类B级
职称英语
相关试题推荐
Youwillhearfivepeoplegivingtheiropinionsonchanginginlife.Forquestions9-13,choosefromthelistA~Fwhateach
Youwillhearonepassageaboutscienceanddailylife.Beforeyoulisten,readthelistofstatements,fiveofwhicharesummar
Lookatthequestionsforthispart.Youwillhearapassageabout"ChangesintheRankingsofBritishUniversities".F
FRIENDSHIP0Ibelievethatnothingmattersasmuchashavingacoupleofreallygood00friends.Theyhelpyoufeell
FRIENDSHIP0Ibelievethatnothingmattersasmuchashavingacoupleofreallygood00friends.Theyhelpyoufeell
FRIENDSHIP0Ibelievethatnothingmattersasmuchashavingacoupleofreallygood00friends.Theyhelpyoufeell
THEESCALATORAnAmerican,CharlesD.Seeberger,inventedmovingstairstotransportpeopleinthe1890s.He(26)______th
HighwaysintheUSTheUnitedStatesiswell-knownforitsnetworkofmajorhighwaysdesignedtohelpadrivergetfromonep
ChangesofWomen’sRoleTheroleofwomeninBritainhaschangedalotinthiscentury,(51)inthelasttwentyyears.Them
随机试题
以下营养物质中只在回肠吸收的包括()
脑梗死CT表现的病理基础,错误的是
A.联苯胺B.氯甲醚C.石棉D.砷E.焦炉逸散物我国职业病名单中,列入职业肿瘤,可引起膀胱癌的毒物是
引起急性胰腺炎休克的主要病因是
男性,36岁。12小时前工作中突然出现右上腹痛,继之出现豆油色尿,半小时前出现上腹痛向腰背部放散,俯首弯腰查减轻腹痛,血压120/180mmHg,呼吸18次/分。下列诊断哪项可能性最大()
社会救济的对象包括( )。
公平责任原则
依据《安全生产培训管理办法》的规定,下列关于安全生产培训工作的说法,正确的是()。
权责发生制的内容是()。
上好课的最根本的要求是()。
最新回复
(
0
)