首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
To: Robert Williams, School of Architecture From: James. Johnson Subject: Air-conditioning Installation Costs for East Hall Date
To: Robert Williams, School of Architecture From: James. Johnson Subject: Air-conditioning Installation Costs for East Hall Date
admin
2014-10-30
33
问题
To: Robert Williams, School of Architecture
From: James. Johnson
Subject: Air-conditioning Installation Costs for East Hall
Date: June 4, 2006
I am writing to inform you of the costs of installing air-conditioning for the seven offices and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the overtime labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject:【B1】______Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two【B2】______
2. Possible problem: some【B3】______might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful【B4】______is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in【B5】______
【B5】
选项
答案
50.the pipe way
解析
转载请注明原文地址:https://kaotiyun.com/show/zsiK777K
本试题收录于:
大学英语三级A级题库大学英语三级分类
0
大学英语三级A级
大学英语三级
相关试题推荐
Whenitcomestohumanresources,hiringhighly-skilledstaffisnotusuallyenoughforacompanytofunctionsuccessfully.Besi
A、Inastore.B、Inacompany.C、Inatravelagency.D、Inabank.D本题询问对话发生的地方。从男士所说“Hello,Ineedtoopenanaccountwithyou”和女
NotonlyRobertbutalsohisparents______toattendourgraduationceremony.
A-Networkedcomputerstations;dial-inaccessB-Campus-wideareanetworkC-Computersandalaserprinterineachclassro
Scientistshavecreatedatomatothatcangrowonsaltywater.Theplantisthefirstcropofitskindeverproducedintheworl
Officersareentitled______travelfirstclass.
A、Before8:45.B、Before9:15.C、After9:00.D、At9:00.A本题属推理判断题。男士说“Themeetingwasstartatnineo’clockinthemorning.”(
Iliketolistentotheradiomuchbetterthan(watch)______TV.
A—GNP(GrossNationalProduct)B—percapitaGNPC—outputvalueD—exercisemacro-controlE—improveecon
Ifyouneedsomethingthatyoucannotreacheasily,politelyaskthepersonclosesttotheitemyouneedtopassittoyou.
随机试题
水下电焊与气割的常见工伤事故有________、____、____和____等。
肾病综合征最常见的并发症是
男性,64岁。30年前曾患右上肺结核,经INH、SM和PAS治疗约1年。5年前病灶复发,痰结核杆菌(++),应用2HRZ/4HR治疗,痰菌转阴,病灶吸收满意。近1个月咳嗽、痰血再次就诊。X线示右上肺前段阻塞性炎症,支气管分层示前段支气管阻塞。痰脱落细胞和
消渴之下消证,若出现阴阳气血俱虚证,治疗应首选
市政消火栓距路边不应超过()m。
背景资料某安装公司承担某市博物馆机电安装工程总承包施工,该工程建筑面积32000m2,施工内容包括:给水排水、电气、通风空调、消防、建筑智能化工程。工程于2010年8月开工,2011年7月竣工,计划总费用2100万元。施工过程中项目部绘
在住宅工程各检验批、分项、分部工程验收合格的基础上,在住宅工程竣工验收前,()组织相关单位,依据国家有关工程质量验收标准,对每户住宅及相关公共部位的观感质量和使用功能等进行检查验收。
建设工程项目质量的影响因素,主要是指在建设工程项目质量目标策划、决策和实现过程的各种客观因素和主观因素,包括( )等。
攻击者使用无效的IP地址,利用TCP连接的三次握手过程,使得受害主机处于开放会话的请求之中,直至连接超时。在此期间,受害主机将会连续接受这种会话请求,最终因耗尽资源而停止响应。这种攻击被称为()。
Samistrainingforthemarathon.Hedrove12milesfromhishometotheGreyHillsParkandthenran6milestoRedRock,retra
最新回复
(
0
)