首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
What is the main part of the Golden Gate Bridge?
What is the main part of the Golden Gate Bridge?
admin
2010-07-06
19
问题
What is the main part of the Golden Gate Bridge?
One of the most famous bridges in the world is the Golden Gate Bridge that spans San Francisco Bay. Because it was built in 1937, it has become one of the first sights people see if they are coming to San Francisco by ship. The main part of the Golden Gate Bridge is a suspension span. It hangs from steel cables that are supported by two huge towers, one at each end of the bridge. The suspension span was the longest in the world when it was finished in 1937. It measures 4,200 feet between the towers. The floor of the
bridge is wide enough for six lanes of cars, three in each direction. There are sidewalks, too, but not many people use them. It costs a lot of time to go on foot from one end of the bridge to the other.
The years since 1950 have been called the era of the giant bridge. Most of them have been built in the United States. The Mackinac Bridge in upper Michigan was finished in 1958. It is a suspension bridge, with foundations resting on rock 200 feet below the surface of the water. With a span of 3,800 feet, it was the second in length to the Golden Gate Bridge.
In 1964 the longest and heaviest suspension bridge was completed in New York City. Known as the Verrazano--Narrows Bridge, it carries traffic between Staten Island and Brooklyn, parts of the city of New York. Before it was built, commuters to the city had to travel by ferry. Now millions of cars pass over the bridge every year. When a lower deck is added, 48 million cars will be able to cross the bridge in a single year.
选项
答案
A suspension span.
解析
转载请注明原文地址:https://kaotiyun.com/show/4IDd777K
本试题收录于:
公共英语四级笔试题库公共英语(PETS)分类
0
公共英语四级笔试
公共英语(PETS)
相关试题推荐
Fordecades,postersdepictingrabbitswithinflamed,reddenedeyessymbolizedcampaignsagainstthetestingofcosmeticsonani
YouwillhearaninterviewwithProf.JesseAusubelabouthisoptimisticattitudestowardsenvironmentalissuestoday.Asyouli
YouwillhearaninterviewwithProf.JesseAusubelabouthisoptimisticattitudestowardsenvironmentalissuestoday.Asyouli
HowdoesReevefeelinacrisis?
Agingbabyboomersaredeterminedtofighttheagingprocess.Theyspendmillionsofdollarsayearon【C1】______theyperceiveas
Throughouthistorytherehavebeenmanyunusualtaxesleviedonsuchthingsashats,Beds,Baths,marriages,andfunerals.Aton
RecentsurveysshowthatJapaneseyouthhavebecomea"MeGeneration"thatrejectstraditionalvalues."Around1980manyJap
Iwasshockedbysucharesponse,andIknowthaterroneousviewssimilartothiscanbeheardeverywhere.【61】Inthelastanal
WhatisthemainpartoftheGoldenBridge?________________________
collision
随机试题
Thedesksandchairscanbe______totheheightofeachchild.
下列哪项不属于荧光免疫显微技术类型
腹部脏器中最容易受损伤的器官是()
维拉帕米的结构是
冷库温度要求常温库相对湿度
患者,男性,28岁,检查发现气管向左侧移位,右侧胸廓饱满,触觉语颤消失,叩诊鼓音,应考虑最可能的原因是
系统性红斑狼疮皮肤损害常见于()。
背景资料:某施工单位承接了10km的山区二级公路工程项目,其中包含一座长800m的双车道隧道。隧道出口处于浅埋段,围岩级别较差导致在施工过程中围岩变形较大,拱顶下沉最大值达到1.6m,因此经建设单位、设计单位、监理单位、施工单位现场勘察后,将从目
(2002年考试真题)甲公司购置了一套需要安装的生产线。与该生产线有关的业务如下:(1)2001年9月30日,为购建该生产线向建设银行专门借入资金500000元,并存入银行。该借款期限为2年,年利率9.6%,到期一次还本付息,不计复利。(2)2001年
设u=sin(x2+y2),其中z=z(x,y)是由方程3x2+2y2+z2=6确定的隐函数,且z(1,1)=1,则
最新回复
(
0
)