Service Request — Maintenance Department (Stubbs College) - Paint all of the walls in the gymnasium and cafe

admin2020-04-13  58

问题                    Service Request — Maintenance
                   Department (Stubbs College)
- Paint all of the walls in the gymnasium and cafeteria
- Fix the hinges of the two broken doors in the Science Department
- Replace the cracked window in the administration building
- Varnish the floors in both the assembly hall and sports hall
Look at the graphic. For which job was an extra cost incurred?
Hello, Mr. Levinson. This is David Wilson, the head of the Maintenance Department here at Stubbs College. I received your message asking why the tasks you assigned me have not yet been fully completed. You’ll be please to know that I’ve repaired the doors in the Science Department and installed a brand-new window in the administration building. The reason the other jobs are not done yet is that my assistant is out with the flu right now. He should be back at work next Monday, so we’ll get the painting and varnishing done as soon as possible. By the way, the sports hall is much larger than I had guessed, so I had to spend some extra money to get more materials. However, I’m sure the college will approve the extra expenditure.

选项 A、Wall painting
B、Door repairs
C、Window replacement
D、Floor varnishing

答案D

解析 解和图表联系的题时,在听留言之前先快速阅读图表和题,然后将其与留言内容联系起来听很重要。留言的后半部分说,“By the way,the sports hall is much larger than I had guessed,so I had to spend some extra money to get more materials.”体育馆比自己想象的大得多,所以要支付额外费用购买材料。再看业务要求书,可知和体育馆相关的业务要求是给地板涂清漆,因此(D)是正确答案。
转载请注明原文地址:https://kaotiyun.com/show/7oOd777K
0

最新回复(0)