首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
48
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
At least ______ points of details may be listed in the above incomplete least.
选项
A、3
B、4
C、5
D、6
答案
B
解析
转载请注明原文地址:https://kaotiyun.com/show/BWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
WhatwilltheStonebarkCompanydoonMarch1?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
Whattypeofcompanyisthecallerworkingfor?
随机试题
1920年11月,共产党早期组织领导的第一个工会是
采血混匀秤质量控制,检查频率和质量标准分别是
女性,48岁,右乳癌根治术后8年,咳嗽半年,3个月前胸片显示右上肺叶直径为2cm圆形阴影,此次复查胸片肿块直径增至2.5cm,呈分叶状。痰找病理细胞及抗酸杆菌均阴性,正确处理是
患者,女性,65岁,因腰椎间盘突出拟入院择期手术治疗。护士小王对其及家属进行沐浴宣教时,下列宣教内容不妥的是
对出口小家电实行凭证报检,这里所说的证是指出口小家电型式试验确认书或型式试验报告,由国家质检总局认可的实验室检测合格后出具。( )
公积金个人住房贷款贷前审查的内容主要有()。
甲、乙签订了买卖合同,甲以乙为收款人开出一张票面金额为5万元的银行承兑汇票,作为预付款交付于乙,乙接受汇票后将其背书转让给丙。后甲、乙因不可抗力解除该合同。下列关于甲的权利主张的表述中,符合《票据法》规定的是()。
俄罗斯的国花是()。
下列选项中,不属于城市总体规划的编制内容的是()。
将考生文件夹下的BLUE文件夹删除。
最新回复
(
0
)