首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below. Keep
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below. Keep
admin
2017-09-22
4
问题
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below.
Keep the Water Away
A Last winter’s floods on the rivers of central Europe were among the worst since the Middle Ages, and as winter storms return, the spectre of floods is returning too. Just weeks ago, the river Rhone in south-east France burst its banks, driving 15,000 people from their homes, and worse could be on the way. Traditionally, river engineers have gone for Plan A: get rid of the water fast, draining it off the land and down to the sea in tall-sided rivers re-engineered as high-performance drains. But however big they dug city drains, however wide and straight they made the rivers, and however high they built the banks, the floods kept coming back to taunt them, from the Mississippi to the Danube. And when the floods came, they seemed to be worse than ever. No wonder engineers are turning to Plan B: sap the water’s destructive strength by dispersing it into fields, forgotten lakes, flood plains and aquifers.
B Back in the days when rivers took a more tortuous path to the sea, flood waters lost impetus and volume while meandering across flood plains and idling through wetlands and inland deltas. But today the water tends to have an unimpeded journey to the sea. And this means that when it rains in the uplands, the water comes down all at once. Worse, whenever we close off more flood plains, the river’s flow farther downstream becomes more violent and uncontrollable. Dykes are only as good as their weakest link—and the water will unerringly find it. By trying to turn the complex hydrology of rivers into the simple mechanics of a water pipe, engineers have often created danger where they promised safety, and intensified the floods they meant to end. Take the Rhine, Europe’s most engineered river. For two centuries, German engineers have erased its backwaters and cut it off from its flood plain.
C Today, the river has lost 7 percent of its original length and runs up to a third faster. When it rains hard in the Alps, the peak flows from several tributaries coincide in the main river, where once they arrived separately. And with four-fifths of the lower Rhine’s flood plain barricaded off, the waters rise ever higher. The result is more frequent flooding that does ever-greater damage to the homes, offices and roads that sit on the flood plain. Much the same has happened in the US on the mighty Mississippi, which drains the world’s second largest river catchment into the Gulf of Mexico.
D The European Union is trying to improve rain forecasts and more accurately model how intense rains swell rivers. That may help cities prepare, but it won’t stop the floods. To do that, say hydrologists, you need a new approach to engineering not just rivers, but the whole landscape. The UK’s Environment Agency—which has been granted an extra £150 million a year to spend in the wake of floods in 2000 that cost the country £1 billion—puts it like this: "The focus is now on working with the forces of nature. Towering concrete walls are out, and new wetlands are in." To help keep London’s feet dry, the agency is breaking the Thames’s banks upstream and reflooding 10 square kilometres of ancient flood plain at Otmoor outside Oxford. Nearer to London it has spent £100 million creating new wetlands and a relief channel across 16 kilometres of flood plain to protect the town of Maidenhead, as well as the ancient playing fields of Eton College. And near the south coast, the agency is digging out channels to reconnect old meanders on the river Cuckmere in East Sussex that were cut off by flood banks 150 years ago.
E The same is taking place on a much grander scale in Austria, in one of Europe’s largest river restorations to date. Engineers are regenerating flood plains along 60 kilometres of the river Drava as it exits the Alps. They are also widening the river bed and channelling it back into abandoned meanders, oxbow lakes and backwaters overhung with willows. The engineers calculate that the restored flood plain can now store up to 10 million cubic metres of flood waters and slow storm surges coming out of the Alps by more than an hour, protecting towns as far downstream as Slovenia and Croatia.
F "Rivers have to be allowed to take more space. They have to be turned from flood-chutes into flood-foilers," says Nienhuis. And the Dutch, for whom preventing floods is a matter of survival, have gone furthest. A nation built largely on drained marshes and seabed had the fright of its life in 1993 when the Rhine almost overwhelmed it. The same happened again in 1995, when a quarter of a million people were evacuated from the Netherlands. But a new breed of "soft engineers" wants our cities to become porous, and Berlin is their shining example. Since reunification, the city’s massive redevelopment has been governed by tough new rules to prevent its drains becoming overloaded after heavy rains. Harald Kraft, an architect working in the city, says: "We now see rainwater as a resource to be kept rather than got rid of at great cost." A good illustration is the giant Potsdamer Platz, a huge new commercial redevelopment by Daimler Chrysler in the heart of the city.
G Los Angeles has spent billions of dollars digging huge drains and concreting river beds to carry away the water from occasional intense storms. The latest plan is to spend a cool $280 million raising the concrete walls on the Los Angeles river by another 2 metres. Yet many communities still flood regularly. Meanwhile this desert city is shipping in water from hundreds of kilometres away in northern California and from the Colorado river in Arizona to fill its taps and swimming pools, and irrigate its green spaces. It all sounds like bad planning. "In LA we receive half the water we need in rainfall, and we throw it away. Then we spend hundreds of millions to import water," says Andy Lipkis, an LA environmentalist, along with citizen groups like Friends of the Los Angeles River and Unpaved LA, want to beat the urban flood hazard and fill the taps by holding onto the city’s flood water. And it’s not just a pipe dream. The authorities this year launched a $100 million scheme to road-test the porous city in one flood-hit community in Sun Valley. The plan is to catch the rain that falls on thousands of driveways, parking lots and rooftops in the valley. Trees will soak up water from parking lots. Homes and public buildings will capture roof water to irrigate gardens and parks. And road drains will empty into old gravel pits and other leaky places that should recharge the city’s underground water reserves. Result: less flooding and more water for the city. Plan B says every city should be porous, every river should have room to flood naturally and every coastline should be left to build its own defences. It sounds expensive and Utopian, until you realise how much we spend trying to drain cities and protect our watery margins—and how bad we are at it.
Questions 14-19
Reading Passage 2 has seven paragraphs, A-G.
Which paragraph contains the following information?
Write the correct letter, A-G, in boxes 14-19 on your answer sheet.
traditional way of tackling flood
选项
答案
A
解析
题干说:应对洪水的传统方法。根据题干关键词“traditional”和“tackling”可定位到A段提到传统上应对洪水的两种方案plan A和plan B。考生也可以根据文本的发展脉络来积极猜测答案出现的位置。本文讲的是应对洪水,按照常理,在开头会列出应对洪水的传统做法。因此,本题的答案为A。
转载请注明原文地址:https://kaotiyun.com/show/DiNO777K
本试题收录于:
雅思阅读题库雅思(IELTS)分类
0
雅思阅读
雅思(IELTS)
相关试题推荐
PEOPLE:CROWD::
Akeyfeatureofquantuminformationscienceistheunderstandingthatgroupsoftwoormorequantumobjectscanhavesta
MEETING:MINUTES::
Sendingarobotintospacetogatherinformationiscertainlyaviableoption,Linebutshouldberegardedonlyasthat--anopt
AstheworksofdozensofwomenwritershavebeenrescuedfromwhatE.P.Thompsoncalls"theenormouscondescensiono
POSTSCRIPT:LETTER::
Wemustlearnto______sentencesandtoanalyzethegrammarofourtext,forthereisno______tothegrammarofpoetry,toth
Thispassageisadaptedfrommaterialpublishedin2001.FrederickDouglasswasunquestionablythemostfamousAfricanAmerican
Governmentofficialsauthorized______becausetheywanttohaveacompleteenumerationofthecountry’spopulation.
ForthosePuritanswhobelievedthat(i)____obligationswereimposedbydivinewill,thecorrectcourseofactionwasnotwithd
随机试题
A、TurningontheTV.B、Someonewalkingaroundthetable.C、Improperquestion-asking.D、Disagreementbetweenfamilymembers.A
有人说,珍藏是一种智慧;也有人说,放弃是一种哲学。请结合自身,谈谈你对这句话的理解。
初孕30岁,妊40周,妇女型骨盆,胎心158次/分,足先露,宫口开全,破水后脐带脱垂。下面最恰当的处理是
人体对Χ线照射高感受性的腺体是
从法律角度看,保险人与投保人通过签订保险合同所建立起来的保险关系属于()。
在社会主义初级阶段,个人收入的分配必须坚持效率优先、兼顾公平的原则,为此必须把()结合起来。
下列各项中,属于政府单位财务会计中净资产的来源的有()。
七夕:织女()
道尔顿制
神州市的发展前景不容乐观,它的发展依赖于工业,工业为居民提供岗位和工资,而它的自然生存环境则取决于消除工业污染,工业污染危及到它的空气、水和建筑。不幸的是,它的工业不可避免地产生污染。如果以上所说都是真的,则它们最有力地支持以下哪项陈述?
最新回复
(
0
)