首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season
admin
2022-03-30
67
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________ , so are expensive
Need to use sunlight to prevent local plants from【L33】________
Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________ to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________ for the roof)
Building and maintenance done by local craftsmen
Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________ are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________ have greater opportunities
More children are educated
【L33】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low.
In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter,
which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter.
And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful.
The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap.
Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering.
In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone,
there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on.
They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities.
They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
freezing
解析
空格前为prevent...from...结构,推测应填入一个名词。录音原文中的protect...from...是题目prevent...front...的同义替换,locally produced plants是local plants的同义替换,故空格处填入freezing。
转载请注明原文地址:https://kaotiyun.com/show/Mu8O777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
Completethesummarybelow.ChooseNOMORETHANTWOWORDSfromthepassageforeachanswer.Writeyouranswersinboxes
systematicdesign
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions15-21ReadingPassage2hasnineparagraphsA-I.Fromthelistofheadingsbelowchoosethemostsuitableheadingfor
Questions15-21ReadingPassage2hasnineparagraphsA-I.Fromthelistofheadingsbelowchoosethemostsuitableheadingfor
Completethesummarybelow.ChooseNOMORETHANTWOWORDSfromthetextforeachanswer.Writeyouranswersinboxes10-
Completethesummarybelow.ChooseNOMORETHANTWOWORDSfromthetextforeachanswer.Writeyouranswersinboxes10-
ListtheFOURmainwaysinwhichBritishcompanieshavetriedtosolvetheproblemofthelanguagebarriersincethe1960s.Writ
ABSENTEEISMINNURSING:ALONGITUDINALSTUDYAbsencefromworkisacostlyanddisruptiveproblemforanyor
随机试题
Americanssufferfromanoverdoseofwork.Regardless【C1】______whotheyareorwhattheydo,Americansspend【C2】______timeatwo
对侵蚀性葡萄胎肺转移的患者的护理正确的是
大量咯血指的是A.每日咯血量100mlB.每日咯血量在200mlC.每日咯血量在300mlD.每日咯血量在500ml以上E.一次咯血量100ml
某国有企业的工程项目,建设单位通过招标选择一家具有相应资质的造价事务所承担施工招标代理和施工阶段造价控制工作,并在中标通知书发出后的第45天,与该事务所签订委托合同。之后双方又另行签订一份酬金比中标价低10%的协议。在施工公开招标中,业主代表为了更好地控
某公司其产品销售不畅,经认真分析后,发现问题主要出在营销环节上,尤其是市场开拓方面。企业计划招聘50人,改革分配制度。请根据以上资料,回答下列问题。进行销售人员面试时,应注意的问题有()。
某商场采用毛利率法进行核算,2017年3月酒类商品的毛利率为30%,结存库存商品余额为1500230元。2017年4月购进酒类商品成本522300元,销售酒类商品的收入为555220元。则月末结存酒类商品的实际成本为()元。
甲公司购买乙公司股权业务如下:(1)2×17年3月2日与乙公司的控股股东A公司(非关联方)签订股权转让协议,协议规定甲公司应以乙公司3月1日经评估确认的净资产9625万元为基础定向增发本公司普通股股票给A公司以取得其所持有乙公司80%的股权;3月10日甲公
材料:以下是某高中生物教师的授课过程。教学内容:《稳态与环境》第5章《生态系统及其稳定性》第5节《生态系统的稳定性》教学过程:过程一:设问:“人类能否在生物圈外建造一个适于人类长期生活的生态
最早明确提出“教学教育性”原理的教育家是()
国有企业在我国国民经济和经济体制改革中的地位。如何理解现代产权制度是“构建现代企业制度的重要基础”?
最新回复
(
0
)