首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
• Read the article below about process management to quality improvement, and the questions on the opposite page. • For each que
• Read the article below about process management to quality improvement, and the questions on the opposite page. • For each que
admin
2010-01-22
66
问题
• Read the article below about process management to quality improvement, and the questions on the opposite page.
• For each question 13--18, mark one letter (A, B, C, or D) on your Answer Sheet for the answer you choose.
PROCESS MANAGEMENT TO QUALITY IMPROVEMENT
The examples above illustrate the need for integrated process and quality management, based on well-structured procedures, sensibly applied. For an organization to function effectively, it must have visible and easily understood procedures that assist staff in carrying out their work and provide accountability for all operations. Providing such a system is not trivial, and it cannot be done without considerable thought and hard work. But the results will more than justify the effort.
Modern management must deal with degrees of complexity unheard of only a few decades ago. They must integrate many systems--for example, for purchasing, personnel, accounting, stock control, and computing--when each of these systems is itself highly complex. At the same time, they must ensure that they comply with a baffling variety of legal, safety, and regulatory and other requirements relevant to their organization. While struggling with these issues, the manager is under irresistible pressure from global competition to reduce costs to the minimum. With such pressure, we are obliged to provide structure and organization, which enable us to deal with such complexity. We group similar processes, collect similar information into records and classify the various activities that the organization must deal with. We organize staff and computer systems into units that deal with similar types of problems or situations.
In all disciplines, the provision of structure of classification is dealt with through a systematic method recognized by the practitioners. In engineering, architecture, medicine and other practical professions, the practitioners learn the relevant methods and then apply them to solve problems. Process and quality management have the same need to approach the problems with a systematic method, which facilitates structuring of problems and produces practical solutions. One of the key criteria for a satisfactory method is that it should be applicable to a wide range of problems and concerns dealt with by the discipline. Once a method is in place, it provides a language and a framework for doing works therefore, it must have the scope to deal with all problems that may arise. In quality management, the range of problems centers on "conformance to requirements". When this is interpreted most widely, as in TQM, requirements are not just those of the direct customer, but also those in internal departments and the wider requirement of the law and of regulatory agencies. Seen this way, all procedures and operations carried out are deal with all such issues uniformly which will provide an efficient and elegant solution to the problem of quality management.
In process management, the problem centers on definition of the objectives of the organization, and the design of processes that support them. Since efficiency and effectiveness are always major objectives, the organization will also require that processes make efficient use of resources, including human and material resources and provide effective results, in terms of meeting the requirements of customers and other stakeholders in the organization. A systematic method must also provide support for these essential process attributes. Finally, the method must support people as they carry out processes. It should enhance their working lives and help them to discover better and more interesting ways of doing their jobs. It should endow empowerment and an involvement in decision-making by everyone involved in the process.
Which of the following is not true?
选项
A、Integrated process and quality management is called for.
B、Considerable thought and hard work are the premise of providing such a mentioned system.
C、The procedures mentioned here can help employees fulfill their work.
D、The effort made in providing such a system will be great while what we get will be little.
答案
D
解析
转载请注明原文地址:https://kaotiyun.com/show/WesO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•Readthearticleaboutgoodsandservices.•ForeachQuestion31-40,writeonewordinCAPITALLETTERSonyourAnswerSheet.
Readthearticlebelowaboutmarketresearch.ChoosethecprrectwordtofilleachgapfromA,B,CorD.Foreachquestion(21-
Readthearticlebelowaboutmarketresearch.ChoosethecprrectwordtofilleachgapfromA,B,CorD.Foreachquestion(21-
•Readthearticlebelowabouthowtodealwithemployeeswithtradesecrets.•ChoosethebestwordtofilleachgapfromA,B,C
•Readthearticlebelowabouthowtodealwithemployeeswithtradesecrets.•ChoosethebestwordtofilleachgapfromA,B,C
•Readthearticlebelowabouthowtodealwithemployeeswithtradesecrets.•ChoosethebestwordtofilleachgapfromA,B,C
•Readthearticlebelowabouthowtodealwithemployeeswithtradesecrets.•ChoosethebestwordtofilleachgapfromA,B,C
•Readthearticlebelowabouthowtodealwithemployeeswithtradesecrets.•ChoosethebestwordtofilleachgapfromA,B,C
•Readthetextbelowfromabrochureforacompanythatrentsoutofficespace.•Inmostofthelines(41-52)thereisoneext
随机试题
修复费用法
创造有价值的人生,应当协调好人生道路上的各种关系。树立正确的人生观,养成积极乐观的人生态度是协调好()的要求。
药物流产失败的评定标准为使用米索前列醇后胎囊仍未排出的天数为
建设工程竣工决算时,计入新增固定资产价值的有( )。
下列安装工程费估算公式中,适用于估算工业炉窑砌筑和工艺保温或绝热工程安装工程费的是()。【2016年真题】
1.背景某写字楼项目,建筑面积84540.4m2,两层连通整体地下室,地上为两栋塔楼,基础形式为筏板基础,结构体系为全现浇钢筋混凝土剪力墙结构。地下结构施工过程中,发生如下事件:事件一:地下室底板外防水设计为两层2mm的高聚物改性沥青卷材,施工单位拟采
WindowsXP提供了一个基于图形的多任务、多窗口的环境。()
付款条件“2/10,1/20,n/30”表示()。
下列日常生活的说法,不正确的是()。
A—accountingsystemJ—fixedassetsB—financialforecastK—netprofitC—balancesheetL—baddebtsD—rentalincomeM—capita
最新回复
(
0
)