Sometimes the processes in which people are engaged are dependent upon other processes being completed first, possibly by other
Sometimes the processes in which people are engaged are dependent upon other processes being completed first, possibly by other
admin
2009-02-15
44
问题
Sometimes the processes in which people are engaged are dependent upon other processes being completed first, possibly by other people. For example, on an automobile(71), it is necessary for the body to be constructed before the doors can be added on. Attempting to add the doors first would be pointless, because there would be nowhere to attach them. Thus, if there is no body ready to have doors added, the process for adding doors has to be(72)until the process for creating the next body is complete. This is known as(73)
Obviously, there are many cases where people have to wait for other people to do something. However, if everyone in such a situation is waiting for someone else to do something first, then no one will ever be able to do anything. When discussing processes, this situation is known as(74), because all of the involved processes are effectively dead because of locks they have on resources. Usually someone in such a situation will eventually notice and abort the process, allowing normal flow to(75), and often warning signs can even be spotted ahead of time to avoid ’it in the first place.
选项
A、suspended
B、broken
C、hung
D、hold
答案
A
解析
suspended:挂起
转载请注明原文地址:https://kaotiyun.com/show/YeUZ777K
本试题收录于:
数据库系统工程师上午基础知识考试题库软考中级分类
0
数据库系统工程师上午基础知识考试
软考中级
相关试题推荐
在招标过程中,下列中的(50)应在开标之前完成。
某网络集成公司对某种网络设备的年需要量为5000件,单价为2000yE,年存储成本为单价的15%,每次订货的订购成本为300元,平均交货时间为10人。一年按365天计算,则该网络设备的全年库存总成本为(66)。
沟通效果较好、比较严肃、约束力强、易于保密的沟通方式是(53)。
定义完原始分析模型后,需要在软件体系结构环境中标识和描述构件。这些构件主要来源不包含(28)。
某省6个城中(A~F)之间的网络通信线路(每条通信线路旁标注厂其长度公里数)如图1-4所示。如果要将部分千兆通信线路改造成万兆通信线路,以提升各个城市网络之间的通信容量,则至少要改造总计(61)公里的通信线路,这种总公里数最少的改造方案共有(62)
Projectschedulemanagementismadeupofsixmanagementprocessesincluding:activitydefinition,activitysequencing,______,
在管理信息系统项目的实施过程中,不仅需要管理过程,也需要技术过程、支持过程、过程改进和商务过程等,它们分别来自项目管理知识、项目环境知识、通用的管理知识和技能、软技能或人际关系技能以及______。A.软件开发方法体系的知识、标准和规定B.软件工具和软
项目计划方法是在项目计划阶段用来指导项目团队制定计划的一种结构化方法。______是这种方法的例子。A.工作指南和模板B.上层管理介入C.职能工作的授权D.项目干系人的技能分析
Projectselectionmethodsinvolvemeasuringvalueorattractivenesstotheprojectownerorsponsorandmayincludeotherorganiz
根据问题描述,依照下面给出的处理序列,给出可能出现的所有序列。(1)R1-----W1-----R2-----W2给出采取措施后可能出现的处理序列。
随机试题
毛泽东同志于哪一年在最高国务会议上提出了“百花齐放,百家争鸣”的方针?()
下列哪项可以准确反映体内贮存铁的情况
设计利用穿堂风进行自然通风的板式建筑,其迎风面与夏季最多风向的夹角宜为:
在水泥砂浆中掺入石灰浆的主要目的是()。
下列各项中,应征收印花税的有()。(2013年)
下列字符中,ASCII码最小的是()。
大豆的脂肪组成以不饱和脂肪酸居多,是高血压、动脉粥样硬化等疾病患者的理想食物。()
课程是为学生的个性全面发展而创设的学校环境的全部内容。()
胡锦涛在十届全国人大三次会议第四次全体会议上当选为中华人民共和国中央军事委员会主席,其意义在于()
下面关于函数模板的表述中不正确的是()。
最新回复
(
0
)