首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
admin
2015-09-30
73
问题
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the hills for miles around, some like giant eggbeaters but most looking like big airplane propellers on poles, spinning in the near-constant breeze through Altamont Pass. When it was built starting in 1981, this was the largest wind farm in the world, and it cemented California’s place as a pioneer in alternative energy.【F1】
Now it’s an outdated relic, relying on old-fashioned technology that produces less power and kills more birds than modern equipment.
Wind turbines, especially the older devices in California, can be buzz saws for birds and bats, though newer, taller turbines seem less deadly. In any case, a study by the National Academy of Sciences found no evidence that wind farms are decreasing bird populations; global warming is a much bigger threat to birds and bats than wind blades.【F2】
Renewable power is too important lo allow such projects to be derailed by narrow interest groups, which is why California and other states should take steps to streamline the approval process.
Resides community opposition, a key roadblock is the lack of transmission lines.【F3】
Wind power has a classic chicken-and-egg problem: Investors don’t want to build wind farms unless lines already exist to connect them to urban centers, and utilities don’t want to add lines until the turbines are spinning.
California, Texas and two other states have come up with a solution. In April, the Federal Energy Regulatory Commission signed off on a plan to shift part of the cost of power lines to California consumers.【F4】
Utilities can charge higher rates to pay for building lines to high-wind areas; once generators connect to the lines, the cost will be recovered via access charges paid by the wind farms.
This should become a national model.
【F5】
The first to benefit from the new regulation will probably be a transmission project from Southern California Edison that is eventually expected to carry 4 ,500 megawatts from wind farms planned in Tehachapi—that’s the equivalent of two nuclear power plants the size of San Onofre, or enough to power 2. 9 million homes.
【F4】
选项
答案
供电局通过提高电费,来筹措通往多风地区的架线经费。一旦发电机接通电网,则可用风力发电场支付的入网费来冲抵架线所花费用。
解析
转载请注明原文地址:https://kaotiyun.com/show/axzZ777K
0
考研英语一
相关试题推荐
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
随机试题
某生产企业位于A市B区。某日因有人举报该企业加工制造伪劣产品,B区工商部门对其进行了突击检查。检查结果认定该企业生产加工中确实存在违法行为,决定对其处以罚款,扣押查封部分生产设备。该企业不服处罚决定,向A市工商管理部门申请行政复议。A市工商部门认定该企业违
________,渐车帷裳。
因肺炎入院,应用抗生素和输液后,体温未下降,今展出现呼吸急促,烦躁。体检:呼吸46/min,血压98/75mmHg,脉搏100/min.口唇有发绀,两肺闻及哮鸣音。为明确诊断应首选哪项检查
下列病因中,因产热过多引起体温升高的是
公路隧道按照长度可划分为()。
对施工过程水污染的防治,正确的有()。
据统计,2013年我省完成货运量305830万吨,比上年增长14.8%,完成货物周转N12407.08亿吨公里,比上年增长26.9%。2012年,全省运输业货运量中水路完成的比例,比货物周转量中水路完成的比例约低()个百分点。
不是由十三届全国人大创新产生的国家机关有:
安全操作常识不包括(60)。
LittleLadyStartsBigWarHarrietBeecherStowehadpouredherheartintoheranti-slaverybook"UncleTom’sCabin."(46)Thepub
最新回复
(
0
)