首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
admin
2015-09-30
59
问题
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the hills for miles around, some like giant eggbeaters but most looking like big airplane propellers on poles, spinning in the near-constant breeze through Altamont Pass. When it was built starting in 1981, this was the largest wind farm in the world, and it cemented California’s place as a pioneer in alternative energy.【F1】
Now it’s an outdated relic, relying on old-fashioned technology that produces less power and kills more birds than modern equipment.
Wind turbines, especially the older devices in California, can be buzz saws for birds and bats, though newer, taller turbines seem less deadly. In any case, a study by the National Academy of Sciences found no evidence that wind farms are decreasing bird populations; global warming is a much bigger threat to birds and bats than wind blades.【F2】
Renewable power is too important lo allow such projects to be derailed by narrow interest groups, which is why California and other states should take steps to streamline the approval process.
Resides community opposition, a key roadblock is the lack of transmission lines.【F3】
Wind power has a classic chicken-and-egg problem: Investors don’t want to build wind farms unless lines already exist to connect them to urban centers, and utilities don’t want to add lines until the turbines are spinning.
California, Texas and two other states have come up with a solution. In April, the Federal Energy Regulatory Commission signed off on a plan to shift part of the cost of power lines to California consumers.【F4】
Utilities can charge higher rates to pay for building lines to high-wind areas; once generators connect to the lines, the cost will be recovered via access charges paid by the wind farms.
This should become a national model.
【F5】
The first to benefit from the new regulation will probably be a transmission project from Southern California Edison that is eventually expected to carry 4 ,500 megawatts from wind farms planned in Tehachapi—that’s the equivalent of two nuclear power plants the size of San Onofre, or enough to power 2. 9 million homes.
【F5】
选项
答案
从这项新规定最先获益的很可能是连通南加州爱迪生的电力传输工程。预期该工程最终可从计划在特哈查皮建设的风力发电场传输4500兆瓦电力。这相当于两个圣安福核电厂的发电能力,足够供290万个家庭用电。
解析
转载请注明原文地址:https://kaotiyun.com/show/ixzZ777K
0
考研英语一
相关试题推荐
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
随机试题
Scientistsfindthathard-workingpeoplelivemuchlongerthanaveragemenandwomen.Careerwomenarehealthierthanhousewives
影响态度改变的团体因素包括()。
A、端端吻合B、端侧吻合C、两者均可D、两者均不可淋巴结与小静脉近端吻合属于______。
引起心源性猝死的最主要病因是
对SLE患者错误的保健指导是
下列论述中哪一项是错误的
《城市居住区规划设计规范》(GB50180—93)(2002年版)中明确规定,城市居住区的规划设计应符合城市总体规划的具体要求内容是()。
“老师,您还记得小飞吗?我至今不明白他在什么地方得罪了您?难道只因为他家杀了猪,没有送您一些肉吗?那次,小飞感冒了,吃了药之后上课犯困,您就借题发挥,在寒风凛冽的冬日,让小飞去外面罚站;而自己却若无其事地关上门,在温暖的教室里继续面色平静地讲课。您知道您的
从决策方式看,中国在改革开放初期提出的“摸着石头过河”的政策属于()。
胡锦涛指出,抗震救灾重大胜利展现了()。
最新回复
(
0
)