Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the h
admin
2015-09-30
71
问题
Beside the 580 Freeway east of the San Francisco Ray, the hills are alive with the sound of whooshing. Wind turbines cover the hills for miles around, some like giant eggbeaters but most looking like big airplane propellers on poles, spinning in the near-constant breeze through Altamont Pass. When it was built starting in 1981, this was the largest wind farm in the world, and it cemented California’s place as a pioneer in alternative energy.【F1】
Now it’s an outdated relic, relying on old-fashioned technology that produces less power and kills more birds than modern equipment.
Wind turbines, especially the older devices in California, can be buzz saws for birds and bats, though newer, taller turbines seem less deadly. In any case, a study by the National Academy of Sciences found no evidence that wind farms are decreasing bird populations; global warming is a much bigger threat to birds and bats than wind blades.【F2】
Renewable power is too important lo allow such projects to be derailed by narrow interest groups, which is why California and other states should take steps to streamline the approval process.
Resides community opposition, a key roadblock is the lack of transmission lines.【F3】
Wind power has a classic chicken-and-egg problem: Investors don’t want to build wind farms unless lines already exist to connect them to urban centers, and utilities don’t want to add lines until the turbines are spinning.
California, Texas and two other states have come up with a solution. In April, the Federal Energy Regulatory Commission signed off on a plan to shift part of the cost of power lines to California consumers.【F4】
Utilities can charge higher rates to pay for building lines to high-wind areas; once generators connect to the lines, the cost will be recovered via access charges paid by the wind farms.
This should become a national model.
【F5】
The first to benefit from the new regulation will probably be a transmission project from Southern California Edison that is eventually expected to carry 4 ,500 megawatts from wind farms planned in Tehachapi—that’s the equivalent of two nuclear power plants the size of San Onofre, or enough to power 2. 9 million homes.
【F5】
选项
答案
从这项新规定最先获益的很可能是连通南加州爱迪生的电力传输工程。预期该工程最终可从计划在特哈查皮建设的风力发电场传输4500兆瓦电力。这相当于两个圣安福核电厂的发电能力,足够供290万个家庭用电。
解析
转载请注明原文地址:https://kaotiyun.com/show/ixzZ777K
0
考研英语一
相关试题推荐
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
Besidethe580FreewayeastoftheSanFranciscoRay,thehillsarealivewiththesoundofwhooshing.Windturbinescovertheh
随机试题
右主支气管的特点是()
对于阴道炎的治疗,下列哪项是不恰当的
紫苏最适合治疗下述哪种病证
企业重大经营决策按决策对象的不同,可分为()。
几个同级人民法院都有管辖权的案件,应由最初受理的人民法院审判。在必要的时候可以移送下列哪一法院审判?
关于土地权属争议与土地侵权纠纷的处理结果不同,下列叙述不正确的是()。
某公路桥梁工程施工项目,建设单位通过公开招标分别与某路桥公司和某监理单位签订了施工合同和监理合同。施工过程中发生如下事件:事件1:施工单位进场后进行了施工准备工作,并在开工前向监理单位提交了该工程的施工组织设计和桩基础施工方案。监理工程
【2012年上】中国古代科学家宋应星所写的是()。
.(2017·广东)心理学家的研究表明,所有的初中生都达到了形式运算阶段。()
试述墨家的教育思想。