Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.

admin2018-08-14  29

问题     Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
    Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
    Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
    Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
    The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
    When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
    The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
    (80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today.
Old City Hall was constructed in______years.

选项 A、3
B、7
C、9
D、11

答案D

解析 细节题。题干问的是“老市政厅修建了多少年?”根据定位句“…建设周期更长达11年”可知,共花了11年。故选D。
转载请注明原文地址:https://kaotiyun.com/show/cdCO777K
0

最新回复(0)