首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
admin
2016-09-08
44
问题
Which Low Carbon Technology Is Now a Reality?
A)With fossil fuels expected to supply over 70% of the world’s energy needs by 2040, we face some urgent questions: where should efforts be focused in reducing greenhouse gas emissions? Which technologies hold the most promise? There are a range of low-carbon solutions and given the challenge, we will need them all. We hear a lot about the advances being made by refreshable sources of energy such as solar, wind and hydro-electricity and these are certainly valuable technologies in combating climate change. But how can we really make a major impact in reducing carbon emissions from large power plants and industrial facilities? Enter carbon capture and storage—or CCS—a technology that captures CO
2
from fossil fuel production and permanently stores it underground.
B)The aim is to prevent the release of large quantities of CO
2
into the atmosphere(from fossil fuel use in power generation and other industries). It is a potential means of relieving the contribution of fossil fuel emissions to global warming and ocean acidification(酸化). Although CO
2
has been injected into geological formations for several decades for various purposes, including enhanced oil recovery, the long term storage of CO
2
is a relatively new concept. The first commercial example was Weyburn in 2000. CCS can also be used to describe the scrubbing(涤气)of CO
2
from environmental air as a climate engineering technique.
C)In November 2014 the Global CCS Institute released its flagship(核心的)publication—the annual Global Status of CCS report. This comprehensive annual update is the prominent source of information on the development of CCS around the world. A lot of work went into updating information in the report, in cooperation with the CCS industry, as there had been quite significant changes to the CCS landscape in the preceding 12 months. This included the launch of a large-scale CCS project in the power sector and the beginning of construction of the world’s first large-scale CCS project in the iron and steel sector.
D)Large-scale CCS is now a reality in the power sector with the October 2014 launch of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project in Saskatchewan, Canada. Boundary Dam is the first commercial CCS plant in the power sector, removing 90 per cent of the CO
2
produced by electricity generation from lignite(褐煤)coal at Production Unit No. 3 of the SaskPower facility. The captured CO
2
is primarily used for enhanced oil recovery(EOR)at the nearby Weyburn oil field, although amounts are also to be stored in deep geological formations at the Aquistore site. The success of the Boundary Dam project and the progression of additional projects through planning and construction, indicates that CCS technologies for application in the power sector are "market ready".
E)The next 18 -24 months will see CCS be applied across a range of industries and storage types. A further two large-scale CCS power projects are in construction in the US—the Kemper County Energy Facility in Mississippi and the Petra Nova Carbon Capture Project in Texas. Both projects are expected to be operational in 2016. Also in the US, the Illinois Industrial CCS project planned for launch later this year will capture CO
2
from the Archer Daniels Midland corn-to-ethanol(乙醇)plant in Decatur, Illinois for storage in an onshore deep saline formation. The Abu Dhabi CCS project in the United Arab Emirates is under construction and from 2016 will provide the world’s first large-scale demonstration of CO
2
capture from iron and steel production.
F)In addition to the 22 large-scale CCS projects currently in operation or construction around the world, 14 projects are in advanced stages of planning, many of which are likely to be in a position to make a final investment decision over the coming year. Together this group of projects covers a range of applications for CCS and could extend to around ten in the number of large-scale CCS projects operating in the power sector by the end of the decade. Their progression to operation would add experience in the dedicated geological storage of CO
2
and see operational large-scale CCS activity extend to China for the first time.
G)2014 saw commercial application in the power sector become a reality and we can look forward to a further expansion across a diverse range of industries in the coming years. The Global CCS Institute continues to cover developments in CCS with up-to-date information, expert insights, workshops, media releases and online seminars. We struggle to make CCS industry information easily accessible and encourage you to engage with us via our website and regular publications.
H)For detailed information on large-scale CCS projects please visit our online Projects page, which you can browse or search for projects based on stage, region, industry or capture, transport and storage type. For the first time the Institute’s website contains project descriptions for around 40 lesser scale "remarkable" CCS projects, of which four Japanese "remarkable" CCS projects were the key focus of a chapter in the Global Status of CCS report. For ongoing expert information visit our Insights page, which is regularly updated with articles from experts in carbon capture and storage, public engagement, legal issues and policy developments.
I)To join in the discussion you can attend meetings and workshops around the world, and participate in online seminars where you will have the opportunity to listen to and ask questions of a range of experts. Visit our Events page to see upcoming meetings, conferences, workshops and seminars. Finally, for a range of up-to-date news and more detailed information, visit our news and publications sections. We look forward to covering this exciting period in the development of CCS and providing you with the latest information and important issues for the sector.
A final investment decision on many projects in the planning stages is likely to be made within the next year.
选项
答案
F
解析
转载请注明原文地址:https://kaotiyun.com/show/ePY7777K
0
大学英语四级
相关试题推荐
A、Heislearningaboutadvertising.B、Heisthenewadvertisingmanager.C、Heisinterviewingthewoman.D、Heiswaitingforan
A、Bybringingananimalrarelyseenonnearbyfarms.B、Bybringingabagofgraininexchangeforaticket.C、Byofferingtodo
Students’pressuresometimescomesfromtheirparents.Mostparentsarewell【B1】_______,butsomeofthemaren’tveryhelpfulwi
TheArtofFriendshipA)OneeveningafewyearsagoIfoundmyselfinananxiety.Nothingwasreallywrong—myfamilyandIwer
A、Contrastingnegotiationstyles.B、Studyinginformationtechnology.C、Contrastingcultures.D、Studyinginternationaltrade.A
A、Thewomanhastowakethemanat7o’clock.B、Thewomanisnotwillingtowaketheman.C、Themanhastowakethewomanat7o
Asthenewsalesdirectorforanationalcomputerfirm,AlexGordonwas【B1】______hisfirstmeetingwiththecompany’sdistrict
HowtoSetupParentalControlsonaSmartphoneSaveyourkidsfromthedarksideoftheInternet.A)Kidsar
TheUnitedStatesestablisheditsfirstnationalpark,Yellowstone,in1872.Yellowstonewasnotonlythefirstnationalparkin
ThingsYouCan’tSayinCanadaA)Attackingoursacredcows(thingsorpeoplethatcannotbecriticized)mayturnyouintoo
随机试题
钢丝绳可分为光面钢丝绳、()和其他钢丝绳3类。
简述亚当·斯密的贡献。
如是者亦有年,犹不改,然后识古书之正伪,与虽正而不至焉者,昭昭然白黑分矣。
某工程合同工期为37天,合同价为360万元,采用清单计价模式下的单价合同,分部分项工程量清单项目单价、措施项目单价均采用承包商的报价,规费为人材机费用和管理费与利润之和的3.3%,税金为人材机费用与管理费、利润、规费之和的3.4%。业主草拟的部分施工合同条
在我国新的课程结构中,高中阶段课程主要属于()。
根据《中华人民共和国宪法》和《中华人民共和国物权法》规定,下列自然资源中不专属于国家所有的财产是()。
根据下列资料。回答下列问题:2012年8月上海市接待外国游客主要客源地中,同比增长量最多的国家是:
A.两侧下颌体的正中联线B.正中联合两旁,近下颌体下缘处,左右各有一隆起C.从颏结节经颏孔支下向后上延至下颌支前缘的骨嵴D.下颌骨的水平部E.下颌骨的垂直部下颌体是指()。
某企业采用资产负债表债务法核算所得税,上期期末“递延所得税资产”科目的借方余额为750万元,适用所得税税率15%,本期经计算可抵扣暂时性差异为2100万元,本期适用的所得税税率为33%。本期“递延所得税资产”科目的发生额为()万元。
Sometimeinnextcentury,thefamiliarearly-morningnewspaperonthefrontdoorwilldisappear.Andinsteadofreadingyournew
最新回复
(
0
)