首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The space agency NASA is busy preparing to return humans to the moon by 2020.
The space agency NASA is busy preparing to return humans to the moon by 2020.
admin
2009-06-24
22
问题
The space agency NASA is busy preparing to return humans to the moon by 2020.
As the United States prepares to return humans to the moon by 2020, the space agency NASA is busy figuring out what to do once they am there. U.S. space officials have had to juggle priorities to meet the goal while still operating space shuttles and a space station.
Last year, NASA revealed its concepts for the rocketships that will carry people and cargo to the moon late in the next decade. This year’s activities build on that, according to the agency official in charge of the moon exploration program, former astronaut Scott Horowitz.
"Last year we did the exploration systems architecture study—basically the ’how are we going to get there’", asked Scott Horowitz. "What we are looking at this year—this is the year of what do we do when we get there?"
The answers will determine what kind of landers the U.S. designs and where they will go. Horowitz says NASA has just begun reaching to industry and scientists for ideas. In contrast, it is much farther ahead on the spaceship that will bring humans to the moon. It plans to choose its prime contractor for that part of the project by August or September.
The program is the result of a new space policy President Bush announced in 2004o to return humans to the moon by 2020 as the first step in an exploration program that would eventually land crews on Mars.
NASA officials have been reorganizing the agency to meet the deadline while continuing to build the International Space Station and operate the space shuttle until 2010. It is like a two front war, and to make things harder, they must work without budget increases for the additional program. Scott Horowitz calls the effort a grand challenge.
"This is different", he said. "For the last 20 or 30 years in human space flight, NASA has been in the operating mode. We have not developed a new spacecraft to lift humans off the planet in over 30 years. It’s a big deal and it’s a big challenge and we can’t keep doing it the way we are doing it with shuttle and station. If we want to continue all the development, which is the launch vehicles and the lander and the robotic precursor missions, we need to do development at the same time we do operations. We are going to have to ask our people to do different things than they do today".
NASA’s boss, Michael Criffin, had hoped to have the new crew vehicle, the successor to the space shuffle, ready by 2012, since it could also be used to visit the space station or for space telescope repair as well as moon missions. But budget problems have caused him to push that back two years.
The money issue is also pressing on the schedule for getting people on the moon. Whereas the original intent was to have an astronaut back on the lunar surface between 2015 and 2020, the goal is now to meet the end of the five year window, although Griffin says he will work hard to advance that.
He also says NASA will try to have the new crew vehicle ready before 2014 to shorten the gap between its first deployment and the last shuffle flight in 2010. The NASA chief does not want the United States to be out of human space flight too long.
"It’s a strategic element of what makes the United States a great power and we will not abandon it", said NASA’s chief.
选项
A、Right
B、Wrong
答案
A
解析
录音材料的第一句经常是全文的主旨,注意辨析与时间有关的数字。
转载请注明原文地址:https://kaotiyun.com/show/gvHd777K
本试题收录于:
公共英语五级笔试题库公共英语(PETS)分类
0
公共英语五级笔试
公共英语(PETS)
相关试题推荐
Thequestionraisedinthefirst.paragraphisone______.WhatDr.Reinhornsaidinthelastparagraphmayimplyallthefollo
WhichofthefollowingisNOTrequiredofanE-2visaapplicant?EFLinparagraph4isanabbreviationof______.
A.thetimely(及时的)discoveryB.convenienceC.sexequalityD.itsconnectionwithhumansE.thehugepowerF.itsuncertaintyEne
Shecouldnotanswer,itwasanimmenseloadoffherheart.
FeastonTurkeyandGoodWishesatThanksgivingFourweeksagoUSchildrendressedasmonstersandaskedforsweets.Thatwas
RisingTuitionintheUSEveryspring,USuniversityadministratorsgathertodiscussthenextacademicyear’sbudget.They
Dolphinsarenottheonlyanimals(31)humansthatusesoundsinanapparentlyintelligentmanner.Whalesalsouseacomplexsys
随机试题
患者,女,34岁。经产妇,腹痛白带多,经治疗效果不佳。妇检:宫颈重度糜烂,宫颈活检病理切片报告为“鳞状上皮化生”。最有可能的诊断是
肺出血肾炎综合征的肾脏主要表现为:
舌体强硬,语言謇涩,伴肢体麻木的临床意义是
关于国有土地,下列哪些说法是正确的?(2010—卷一—75,多)
压缩试验时,土样侧向有变形。()
( )有助于确定一个特定企业或特定的建设工程可能遭受哪些损失,以及在何种情况下遭受这种损失。
【背景资料】某水电站大坝为混凝土双曲拱坝,坝高240m,总库容58亿m3,装机容量6×55万kW,年发电量约172亿kWh,固结灌浆施工于2008年12月开始施工,2013年3月全部完成。(1)地质简况和岩体质量分级。根据岩石强度、岩体
下列各项税金中,在计算介业所得税时,不可以作为产品销售税金及附加在税前扣除的是()。
某航运公司以6000万美元订造了一艘50000载重吨的散货船,预计船舶使用期为10年,采用直线折旧法进行折旧,残值为船价的12%。该船主要提供中国S港与欧洲L港间的散货运输,全年共营运6个往返航次。S港与L港之间每个往返航次的燃油成本为48.6万美元,S港
右图中共有()个三角形。
最新回复
(
0
)