首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Removing Dams P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factor
Removing Dams P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factor
admin
2018-10-18
30
问题
Removing Dams
P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factory watermills, and other purposes that allowed farming on lands that would otherwise be too dry, with low-cost hydroelectric power generation being a very significant side benefit. Building these dams was rather labor-intensive, which created jobs for workers and stimulated regional economic development. But those opposed to large dams can marshal a sobering array of criticisms based on those already built, which have provided some benefits but have without exception destroyed river environments and the human communities that depend on them.
P2: Many, perhaps most, of the more than 90,000 dams in the country are now obsolete, expensive, and unsafe, and were built with no consideration of the environmental costs. As operating licenses come up for renewal in 1999, habitat restoration to original stream flows will be among the options considered. As these dams age and decay, they can also become public safety hazards, presenting a failure risk and a dangerous nuisance. Worse still, with the growth of the American population, more people are moving into risky areas. Dams that once could have failed without major repercussions are now upstream of cities and development. In 1998, the Army Corps announced that it would no longer be building large dams. In the few remaining sites where dams might be built, public opposition is so great that getting approval for projects is unlikely.
P3: For many years, the United States Fish and Wildlife Service had advocated the removal of the Edwards Dam, which was built in 1837 on the Kennebec River in Augusta, Maine, to ease navigation and generate electricity. The Kennebec River was once home to all ten species of migratory fish native to Maine, along with several thriving commercial fisheries. Damming the river not only transformed the natural landscape, but it also prevented migration of salmon, shad, sturgeon, and other fish species up the river.
In 1999, the Federal Energy Regulatory Commission (FERC) refused the renewal of the dam license due to excessive negative environmental impact, and the dam was removed, freeing a 17-mile stretch of the Kennebec River that had been submerged for 162 years. P4: The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits.
P5: When the negative environmental effects outweigh the benefits, a dam may be considered for removal. The Hetch Hetchy Dam, whose construction was one of the first major defeats of the nascent American environmental movement, was approved in 1913 to assist earthquake-ravaged San Francisco. Environmentalists and nature lovers, who said the valley’s beauty surpassed even Yosemite Valley’s, have constantly fought for its removal. They claim that restoring Hetch Hetchy Valley could reclaim an area that is half the size of Yosemite Valley and nearly identical in terms of beauty. Revenue and increased local spending from tourism could offset some or all of the losses from removing the dam. This problem can be thought of as appraising the relative value of two scarce resources, water and space, in Yosemite National Park.
P6: How does one weigh the many different economic, cultural, and aesthetic considerations for removing or not removing these dams? Do certain interests, such as the rights of native people or the continued existence of native species of fish or wildlife, take precedence over economic factors, or should this be a utilitarian calculation of the greatest good for the greatest number? And does that number include only humans, or do other species count as well?
P4: ■ The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. ■ This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. ■ Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. ■ Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits.
The word "disrupted" in the passage is closest in meaning to
选项
A、modified
B、affected
C、upset
D、discharged
答案
C
解析
【词汇题】disrupted意为“扰乱”。
转载请注明原文地址:https://kaotiyun.com/show/gwfO777K
0
托福(TOEFL)
相关试题推荐
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.BirminghamexhibitionExampleAnswerPur
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.BirminghamexhibitionExampleAnswerPur
Completethenotesbelow.WriteONEWORDONLYforeachanswer.EffectsofurbanenvironmentsonanimalsIntroductionRecenturba
WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.MonarchButterfliesHibernationButterflyspeciesadoptdifferent
Choosethecorrectanswer,A,BorC.Camber’sThemeParkAccordingtothespeaker,inwhatwayisCamber’sdifferentfromothe
Whichofthefollowingquestionsdoesthepassagemainlyanswer?Theword"they"inline20refersto
Theword"it"inline3referstoInparagraph3,theauthormakeswhichofthefollowingstatementsaboutaspecies’survival?
"WeatherandChaoticSystems"Scientiststodayhaveaverygoodunderstandingofthephysicallawsandmathematicalequatio
WATERANDLIFEONMARS1Thepresenceorabsenceofwaterhasadirectbearingonthepossibilityoflifeonotherplanets.In
随机试题
论述你对郑板桥“眼中之竹”“胸中之竹”“手中之竹”创作过程的理解。[江苏2019]
函数y=y(x)由方程确定.求y’.
A.血、尿、大便常规检查B.病理检查C.内镜检查D.影像学检查E.肿瘤标志物直接观察肿瘤
尿中带血,小便频数,赤涩热痛,舌红脉数者,治宜选用
肿瘤的分化程度低说明其
圆截面杆ABC轴向受力如图。己知BC杆的直径d=100mm,AB杆的直径为2d,,杆的最大的拉应力是()。
每个行业都要经历一个由成长到衰退的发展演变过程,这个过程便称为行业的生命周期。一般地,行业的生命周期可分为幼稚期、成长期、成熟期和衰退期。()
商业银行需要计量交易对手信用风险的交易有()。
根据《民法通则》的规定,如果被代理人出具的授权委托书授权不明,下列说法错误的有()。
【2016年江苏省第61题】已知A、B两地相距600千米。甲、乙两车同时从A、B两地相向而行,3小时相遇。若甲的速度是乙的1.5倍,则甲的速度是()。
最新回复
(
0
)