A、It is time consuming. B、It cannot make bad work good. C、It costs a lot. D、It is not effective at all. B总结题。关于检查成品质量的问题,受访者说:Th
A、It is time consuming. B、It cannot make bad work good. C、It costs a lot. D、It is not effective at all. B总结题。关于检查成品质量的问题,受访者说:Th
admin
2020-06-04
24
问题
I: Good morning, ladies and gentlemen. Today we are greatly honored to have Mr. Alan Gibbons, an inspector from the Australian Industrial Bureau to introduce us an important stage in the production process - quality control. Well, Alan.
A: Good morning everyone.
I: Alan, it is believed that an effective quality control system amounts to an inspection of the finished product. Is that right?
A: It is true in certain aspects. However, it has got problems. The main drawback with a finished product inspection is that it is an "after the act" operation. You know, no amount of inspection can make bad work good at this stage.
I: Then when is the ideal time for quality control?
A: Most large scale manufacturers consider quality control to be an ongoing process. The advantages of this are considerable. It cuts wastage, it saves time, as no hours are lost on work done on already defective items, and perhaps most importantly, it is easier to detect a fault, when the product is still at the component stage.
I: That’s reasonable. So what should quality control begin with?
A: Well, usually with raw materials. If the materials are of sub-standard materials there is no point in processing them. More to the point, sub-standard materials can be returned to the company at no cost to the manufacturer.
I: Mm, this is obvious.
A: Although these benefits seem obvious, you might be surprised to know that only 87% of large firms and 62% of small firms have a standard raw material inspection procedure. For the same reasons, it is a good idea to test components brought in from another company.
I: I see. After that, what should be inspected?
A: In many manufacturing processes, it is useful to carry out some form of quality control on products while they are still being manufactured. It is often easier to check individual components before assembly takes place. Equally, it may be valuable to test components by their function. I suppose the bottom line is that every product and every company has its own requirements and the quality control programme should be arranged accordingly.
I: So if each component functions well, the entire product comes out right.
A: Exactly.
I: Then what are we testing for? I mean do we test the same things out of different products or do we test differently?
A: Of course this depends on the product, too. An expensive car has different requirements from a cheap plastic toy. However, in both cases the most vital testing is for safety.
1. What is the main disadvantage of finished product inspection ?
2. Which one is NOT the advantage of keeping quality control as an ongoing process ?
3. What should quality control begin with?
4. What are the percentages of large firms and small firms in terms of standard raw material inspection procedure?
5. What is the most vital aspect in testing?
选项
A、It is time consuming.
B、It cannot make bad work good.
C、It costs a lot.
D、It is not effective at all.
答案
B
解析
总结题。关于检查成品质量的问题,受访者说:The main drawback with a finished product inspection is that it is an“after the act”operation.You know, no amount of inspection can make bad work good at this stage.(检查成品质量的主要缺点在于它是“事后”检查,在这个阶段已经无法把坏工作改好了。)录音中的drawback和disadvantage是同义词,所以选项B正确。
转载请注明原文地址:https://kaotiyun.com/show/jSbK777K
0
专业英语八级
相关试题推荐
SuggestopediaI.Introduction—basis:how【T1】______worksandhowwelearnmosteffectively【T1】______—derivedfrom【T2】______
ChineseAmericansI.EarlyimmigrationA.thefirstgroupofChineseimmigrants—cameto【T1】______【T1】______—becamethe【T2】__
ChineseAmericansI.EarlyimmigrationA.thefirstgroupofChineseimmigrants—cameto【T1】______【T1】______—becamethe【T2】__
HowtoSpeakGoodEnglishManylearnershavedifficultyincommunicatingduetothelackofconfidenceandrightmethods.T
A、Classicsrecommendedbytheschool.B、ClassicsonwhichDisneyfilmsarebased.C、Storiesaboutmurdersandpoetry.D、Stories
A、Shewoulddoexperimentaldesignonly.B、Shewouldcontinuetobeanadministrativeassistant.C、Shewouldbeateacher.D、She
A、Bullyingcanoccuranywhere,notjustinschool.B、Teachersmustpaymoreresponsibility.C、Childrenshouldbeblamed.D、Bully
A、Bullyingisnotinevitable.B、Bullyingofcontinuallytauntedcanbetolerant.C、Bullyingisanightmaretoallchildren.D、Th
随机试题
A.T3,T4B.FT3,FT4C.TRH兴奋试验D.131I摄取率E.T3抑制试验甲亢性心脏病及其他型心脏病、老年禁做
骨盆外测量时髂嵴间径正常值为
不属于青少年心理健康教育的主要内容是
林某和吴某签订协议约定将吴某所有的一辆汽车卖给林某,约定林某向吴某支付一半车款后吴某将汽车交付给林某,但在林某付清全部车款前车辆仍然归吴某所有。林某向吴某支付一半车款后吴某将汽车交付林某。邓某因为借款纠纷起诉吴某,诉讼中,邓某申请法院采取保全措施,申请法院
单位工程施工方案的编制中,关于施工方法和施工机械的选择,下列说法不正确的是()。
纳税人、扣缴义务人应当按照国家有关规定,持税务登记证件,在银行或者其他金融机构开立基本存款账户和其他存款账户,并将其基本存款账户的账号向税务机关报告。()
()以期货交易所违反法律法规,履行监督管理职责不当,造成其损害为由提起的商事诉讼案件属于期货交易所履行职责引起的商事案件。
“会当凌绝顶,一览众山小”是泰山上天街的真实写照。()
制约学校课程的有()几大因素。
学校教育具有开发个体特殊才能和发展个性的功能。()
最新回复
(
0
)