首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
计算机
Many of the activities performed during the preliminary investigation are still being conducted in(31),but in much greater depth
Many of the activities performed during the preliminary investigation are still being conducted in(31),but in much greater depth
admin
2019-06-06
99
问题
Many of the activities performed during the preliminary investigation are still being conducted in(31),but in much greater depth than before.During this phase,the analyst mustbecome fully aware of the(32) and must develop enough knowledge about the(33) and theexisting systems to enable an effective solution to be proposed and implemented.Besides the(34) for process and data of current system,the deliverable from this phase also includes the(35) forthe proposed system.
(35)
选项
A、hardware and software specification
B、system performance specification
C、formal requirements definition
D、general problem statement
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/k7FZ777K
本试题收录于:
信息系统项目管理师上午综合知识考试题库软考高级分类
0
信息系统项目管理师上午综合知识考试
软考高级
相关试题推荐
数据挖掘的分析方法可以划分为关联分析、序列模式分析、分类分析和聚类分析四种。如果某方法需要一个示例库(该库中的每个元组都有一个给定的类标识)做训练集时,这种分析方法属于(41)。
企业信息化规划是一项长期而艰巨的任务,是融合企业战略、管理规划、业务流程重组等内容的综合规划活动。其中(1)战略规划是评价企业现状,选择和确定企业的总体和长远目标,制定和抉择实现目标的行动方案;(2)战略规划关注的是如何通过信息系统来支撑业务流程的运作,进
用户乙收到甲数字签名后的消息M,为验证消息的真实性,首先需要从CA获取用户甲的数字证书,该数字证书中包含(1),并利用(2)验证该证书的真伪,然后利用(3)验证M的真实性。(1)
美国某公司与中国某企业谈技术合作,合同约定使用1件美国专利(获得批准并在有效期内),该项技术未在中国和其他国家申请专利。依照该专利生产的产品(),中国企业需要向美国公司支付这件美国专利的许可使用费。
使用ADSL拨号上网,需要在用户端安装()协议。
Duringthesystemsanalysisphase,greateruserinvolvementusuallyresultsinbettercommunication,fasterdevelopmenttimes,and
Duringthesystemsplanningphase,asystemsanalystconductsa(71)activitytostudythesystemsrequestandrecommendspecific
(74)is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.
DefineActivitiesistheprocessofidentifyingthespecificactionstobeperformedtoproducethe(71).
随机试题
肺性脑病
胫骨中下1/3交界处是骨折的好发部位,其原因是
根据《中华人民共和国环境保护法》的规定,有关环境质量标准的下列说法中,正确的是:
建设社会主义新农村有以下()要求。
背景创建文明建设工地是工程建设物质文明和精神文明的最佳结合点;是工程项目管理的中心环节;同时也是水利水电企业按照现代企业制度要求,加强企业管理,树立企业良好形象的需要。某水利枢纽工程积极参与文明工地评选,由该工程建设单位向上级提出申请,并准备了相
网络计划调整的方法有______。
挡烟高度即各类挡烟设施处于安装位置时,其底部与顶部之间的垂直高度,要求不得小于()。
Theboss______intoarageandstartedshoutingatRoberttodoashewastold.
Andersonwasdisappointedwhenhefoundouttheyhadgonetothetest-site______him.
Hehasabadcoldand______iswhyhedidn’tcome.
最新回复
(
0
)