Once______MacDougal Boulevard, the street is undergoing repairs and will be called Cosa Boulevard after the construction is comp

admin2019-07-26  50

问题 Once______MacDougal Boulevard, the street is undergoing repairs and will be called Cosa Boulevard after the construction is completed.

选项 A、name
B、to name
C、named
D、naming

答案C

解析 此句主干成分完整:the street is undergoing repairs and will be called Cosa Boulevard,故应将“Once______MacDougal Boulevard”看成修饰成分。因此选项中可充当修饰成分的不定式结构(B)、分词(C)和(D)为备选答案。根据上下文语义,此处意为“曾被命名为MacDougal大道的道路”,因此过去分词(C)named为正确答案。如选择不定式结构(B)to name,则意为“此道路为了曾经被命名为MacDougal大道而正在进行施工”,语义不通顺。如选择现在分词(D)naming,则被修饰的名词(the street)与分词之间是主动关系,意为“现在(为之)命名为MacDougal大道的道路”,语义不通顺。动词(A)不能充当修饰成分。
转载请注明原文地址:https://kaotiyun.com/show/pEZd777K
0

最新回复(0)