首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every da
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every da
admin
2018-08-14
54
问题
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe(部落), is determined to stop the 1,172-mile pipeline from being built. (76)
Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
Which of the following is the main idea of the passage?
选项
A、The Dakota Access Pipeline will create more markets for oil and gas.
B、The Dakota Access Pipeline will create many job opportunities.
C、American Indians oppose the construction of an oil pipeline.
D、American Indians fight for equal voting rights.
答案
C
解析
主旨题。题干问的是“下列哪项表达了本文的大意?”根据定位句第一句“ETP公司期望在今年内完成输油管道建设”,第三句“立岩苏族决定要中止1172英里长的输油管道的修建”,第四句“双方都没有妥协的迹象”可知双方矛盾所在。A项“达科塔输油管道将为原油和天然气创造更多市场”;B项“达科塔输油管道将创造更多就业机会”;D项“美国印第安人为平等投票权而战”在文中均没有提及。故选C。
转载请注明原文地址:https://kaotiyun.com/show/pdCO777K
0
成人本科学位英语
相关试题推荐
InChinaitisrelativelyusualtoaskpeopletheirage,butintheWestthisquestionisgenerallyregardedasimpolite.Thisi
Havingnomoneybut______toknow,hesimplysaidhewouldgowithoutdin-ner.
Iwasgivingatalktoalargegroupofpeople,thesametalkI______tohalfadozenothergroups.
ProfessorSmithrecentlypersuaded35people,23ofthemwomen,tokeepadiaryofalltheirabsent-mindedactionsforafortnig
Itwaswhileshewassleepinginherbedroom______athiefbrokeintothehouse.
SmithsoldA(mostof)hisB(belongings).HehashardlyC(nothing)leftD(in)thehouse.
Theyarenotsowilling______thispicturehunginthehouse.
Heprefers______interestingbooksto______TVintheevening.
OnlyAunderspecialBcircumstancesCfreshmenarepermittedDtotakemake-uptest.
Ipromisedtolook()thematterassoonasIgotthere.
随机试题
根据《标准施工招标文件》中“通用合同条款”的规定,承包人应在(),向监理人提交承包人在施工场地的管理机构以及人员安排的报告。
清肝养血,明目退翳的药物是
小刘,因运动不慎造成左小腿闭合性骨折,但未涉及膝、踝关节面,骨折处已复位固定。3天后,肿胀及疼痛已减轻,小刘可以开始做的训练是
下列规范性文件中由国务院颁布的是
房地产转让申报的成交价格明显低于正常市场价格的,应以()作为缴纳税费的依据。
下列有关合伙企业财产的分割、转让和处分的说法中,错误的是()。
辽宁省地处欧亚大陆东岸、中纬度地区,属于()气候。
被告人:汤甲,男,26岁,因为犯盗窃罪被判处有期徒刑2年,2002年3月4日刑满释放;汤乙,男,29岁。2004年4月4日下午,被告人汤甲、汤乙两兄弟开手扶拖拉机去某村运输氟石,因故未运成。归途路经周庄村时,被告人汤甲见该村口公路旁堆有氟石,即示意停车,
下列表达式计算结果为日期类型的是
A、Hercolleagues.B、Herneighbors.C、Herfriends.D、Herschoolmates.B
最新回复
(
0
)