首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
财经
To: Bertrand Fournier, Plant manager b_fournier@dawson.com From: John Reynolds, Industrial production manager j_reynolds@dawson.
To: Bertrand Fournier, Plant manager b_fournier@dawson.com From: John Reynolds, Industrial production manager j_reynolds@dawson.
admin
2014-11-06
46
问题
To: Bertrand Fournier, Plant manager b_fournier@dawson.com
From: John Reynolds, Industrial production manager j_reynolds@dawson.com
Re: Valbonne, France plant
Date: January 13
Dear Mr. Fournier,
Thank you for your e-mail requesting that our engineers from London examine your chocolate production plant in Valbonne again next month. All of us at Dawson corporate headquarters appreciate your factory’s desire to manufacture the finest chocolate, and we want to provide a support team to ensure that this is possible. Before we schedule a trip for Edith Singh and Barry Weinstein to visit your plant again. I have a few questions in regard to the production problems you mentioned. First, I was wondering when the refrigeration unit was inspected last. Some Dawson plants in Geneva and Warsaw recently reported problems with their refrigeration systems, so I suggest that the temperature of the refrigerators during the cooling phase be checked. Second, do you think it is necessary for Ms. Singh and Mr. Weinstein to stay in Valbonne an entire week?
I believe their examination could be completed within two days.
Please let me know your views on these issues. I look forward to hearing from you.
Regards John Reynolds
To: John Reynolds, Industrial production manager j_reynolds@dawson.com
From: Bertrand Fournier, Plant manager b_fournier@dawson.com
Re: Valbonne, France plant
Date: January 15
Dear Mr. Reynolds,
Thank you for your reply. In response to your questions, we have carefully examined all of our equipment and the entire production process, from the grinding of the cocoa beans to the pressing of the chocolate. The refrigerators are cooling the product at the appropriate temperature, but we are still producing chocolate that is too bitter. We believe the problem may be either in the grinding or roasting of the cocoa beans, but we need your engineers to verify our suspicion. As to the duration of the engineers’ visit, you may be correct. They do not need to stay a week in Valbonne, but I would suggest they stay at least three days.
Please confirm the dates of February 12-14 for their trip.
Regards, Bertrand Fournier
What does Mr. Reynolds recommend that Mr. Fournier do?
选项
A、Order new ingredients
B、Talk to production managers
C、Check refrigeration equipment
D、Visit another plant
答案
C
解析
从第一封邮件第六行可以得知。
转载请注明原文地址:https://kaotiyun.com/show/qHgc777K
本试题收录于:
英语题库银行系统招聘考试分类
0
英语
银行系统招聘考试
相关试题推荐
ResidentsofPineBeacharedividedoverplansforahighwayaimedatreducingtraffic__________byvacationerseveryyear·
Thefirmprovides_________careandlifeinsurancebenefits.
[2011年典型真题]America’smostpopularnewspaperwebsitetodayannouncedthattheeraoffreeonlinejournalismisdrawingtoaclose
[2011年典型真题]America’smostpopularnewspaperwebsitetodayannouncedthattheeraoffreeonlinejournalismisdrawingtoaclose
Directions:Thereare20blanksinthefollowingtext.ForeachblanktherearefourchoicesmarkedA,B,CandD.ChoosetheONEtha
Directions:Thereare20blanksinthefollowingtext.ForeachblanktherearefourchoicesmarkedA,B,CandD.ChoosetheONEtha
Theword“day”hastwomeanings.Whenwetalkaboutthenumberofdaysinayear,weareusing“day”tomean24hours.Butwhenwetalk
ATTENTION!PARKVISITORSAsofJune1st,2006,theTrentonCountyDepartmentofParkServicesisinstitutingthefollowing
EconomicRecoveryontheWayEconomicexpertsarepredictingthatthepoorlyperformingdomesticeconomywillrecoverinthe
TheLynndaleSpringLineIsHereThisyear’sspringlinemayjustbeourbestcollectionyet!Ouraward-winningdesignersh
随机试题
行政复议机关应当审查具体行政行为的真实性和是适当性。()
《缘缘堂续笔.癞六伯》中,癞六伯的人生态度是()
Todayismyfirstdayintheoffice.Mynewemployerexplainsthedutiesofthejobtome.Aspartofmysecretarialduties,Is
A.前锯肌功能丧失,双手推墙时出现翼状肩胛B.伸腕、伸指功能丧失,出现腕下垂C.二者均有D.二者均无(2004年第128题)臂丛神经束支损伤时可出现
斜坡型者舌杆应离开黏膜多少与牙槽嵴平行()
【2004年真题】在价值工程活动中,所绘制的功能系统图是指按照一定的原则和方式将定义的功能连接起来的一个完整的功能体系。在该体系中,上级功能和下级功能分别是指()。
【背景资料】某公司已中标某城市高架桥工程,该工程75跨均系现浇预应力箱梁,总长2390m。高架桥面宽30m,桩基均为φ800、φ1000钻孔灌注桩,埋置式承台,Y形独立式立柱,地面至箱梁底净高10m左右,全线将上跨4条城市次干道,一条城市主干道,
财政政策的手段包括()
党的十七大报告指出,要把城乡社区建设成为()的社会生活共同体。
下列软件中不能用于网络嗅探的是()。
最新回复
(
0
)