首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
48
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M4】
选项
答案
ON
解析
此处的including为及物动词的ing形式,后面直接跟宾语,无需介词与其搭配,故ON多余。
转载请注明原文地址:https://kaotiyun.com/show/reoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•Therearethirtyquestionsonthisquestionpaper.•Instructionsaregivenonthetape.•YoucanwriteonthisQuestionPape
•Youwillhearanotherfiverecordings.Eachspeakerisleavingamessageonanansweringmachine.•Foreachrecording,decidew
•Youwillhearfiveshortrecordings.Eachspeakerissayingwhatamanagermustdotoachievesuccess.•Foreachrecording,d
HowtoapproachListeningTestPartTwo•Thispartisintwosections.Ineachsectionyoulistentofiveshortmonologues,spo
•Youwillhearamangivingadviceonhowtogiveagoodpresentation.•Foreachquestion23—30,markoneletter(A,BorC)for
•Lookatthenotesbelow.•Youwillhearatelephoneconversationaboutthearrangementsforameeting.
OutsourcingreferstoADCConsulting’ssurveyfoundthatoutsourcingwas
•Therearethirtyquestionsonthisquestionpaper.•Instructionsaregivenonthetape.•YoucanwriteonthisQuestionPape
Youareinchargeoftechnicalresourcesinyourcompany.YouhavejustreceivedaletterfromtheCustomerServicesManagerat
—Readthearticleaboutchoosinganagent.—Inmostofthelines34~45thereisoneextraword.Itiseithergrammaticallyincor
随机试题
患者男性,56岁,1年前出现胸骨后烧灼感,偶有疼痛,近2个月症状加重,并出现进食时哽噎感并进行性加重。首先考虑的诊断是
小儿腹泻引起代谢性酸中毒的原因
关于滴丸的叙述,正确的有
()是编制施工图预算的重要依据之一,通过它可充分了解各分部分项工程的施工方法、施工进度计划、施工机械的选择、施工平面图的布置及主要技术措施等内容,是传统计价中工程量计算和定额套用的依据,也是工程量清单计价中计取措施费的依据。
二级及二级以下公路的路面排水,一般由()组成。
近几年来,老百姓通过非传统渠道购买洋货已形成一股风潮,从名牌手表、皮包、服装,到化妆品、奶粉、纸尿裤、家电,国外品牌、国外制造的消费品每天都在________地流人中国的千家万户。在今天这种高度全球化、商品流动非常便利的环境下,一国老百姓消费世界各地的优质
设f(x,y)连续,且f(x,y)=xy+f(u,υ)dudυ,其中D是由y=0,y=x2,x=1所围区域,则f(x,y)等于()
请在【答题】菜单下选择【进入考生文件夹】命令,并按照题目要求完成下面的操作。注意:以下的文件必须都保存在考生文件夹下。中国的人口发展形势非常严峻,为此国家统计局每10年进行一次全国人口普查,以掌握全国人口的增长速度及规模。按照下列要求完成对第五次、第六
Whatattractscustomers?Obviouslythequalityofaproductdoes,butvisualimages【61】agreatdeal.Itisnotonlytheimagepr
Scientistshavewonderedforalongtimeifanimalscanlearntotalkashumanbeingsdo.Severalyears【C1】______,twopsycholo
最新回复
(
0
)