首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The preindustrial period of the development of cities in the United States began with the establishment of the colonies in the
The preindustrial period of the development of cities in the United States began with the establishment of the colonies in the
admin
2011-02-11
46
问题
The preindustrial period of the development of cities in the United States
began with the establishment of the colonies in the late 1600’s and lasted until
about 1850. During this period, urban residents made up a small percent of 【M1】______
the total population and cities were small on size. The leading cities were East 【M2】______
Coast seaports. The importance of water transportation in the preindustrial
period is reflected in building of many canals to expand the area in which trade 【M3】______
could be conducted. Water power was also the chief source. Most city
residents worked in commerce and trade, administration, service, the small-
scale hand production of goods. Mechanic production in the United Sates had 【M4】______
its beginnings only in the 1820s, when the first textile mills were set up in
New England using the spinning and weaving machines that had been invented
somehow earlier in England. Most people were farmers, but even city 【M5】______
residents were overwhelming rural in background and experience. The 【M6】______
internal structure of cities in the preindustrial period was relatively
differentiated into separate areas for separate activities, for they were small 【M7】______
enough such that people could easily work or ride, by horseback or by horse
and wagon, to the variation of available facilities. Thus, houses, shops, and 【M8】______
public buildings were typically interspersed; often the shopkeepers or artisans
lived above or behind their stores.
In the preindustrial cities in the United States, which we now regard as 【M9】______
municipal services did not exist. Generally, residents and businesses were
responsible for providing their own water supplies, disposal of sewage and
garbage, and health services. In a time, firefighting and police protection 【M10】______
were also provided on a volunteer basis.
【M10】
选项
答案
in—改成for
解析
不存在in a time短语,应将in改为for。for a tine表示“曾经,一度”。
转载请注明原文地址:https://kaotiyun.com/show/tYeO777K
0
专业英语八级
相关试题推荐
MoneyinAmericaMoneyisusedtobuygoodsorservicesand【1】______debts.【1】______InAmerica,moneysupplyconsists
A、requiregoodeducation.B、aresecondarytoeducation.C、don’tcallforgoodeducation.D、don’tconflictwitheducation.C这题检查
______andWilliamShakespearearcthebestrepresentativesoftheEnglishhumanism.
Thefoxreallyexasperatedthemboth.Assoonastheyhadletthefowlsout,intheearlysummermornings,theyhadtotakethei
1Whilethemissionofpublicschoolshasexpandedbeyondeducationtoincludesocialsupportandextra-curricularactivities
A、therecordingindustryandon-linerecordcompaniesB、’therecordingindustryanddownloading-programoperatorsC、EMIandon-l
ArtavidBushsupporterwhoalreadyhas25shoppingmallstohisname,Congelhimselfisnotamanyouwouldexpecttoentertain
IntroductionLinguisticshasbothpracticalandphilosophicalmotivations.Soboththefirstandsecondeditionsofthistex
Itcanbeshowninfactsandfigurethatcyclingisthecheapest,most【M1】______convenient,andmostenvironmentallyde
DanishpolicehavebeenleftscratchingtheirheadsastheyhuntforthevandalswhodecapitatedtheLittleMermaid.Fewclue
随机试题
台虎钳夹持工件时,可套上长管子扳紧手柄,以增加夹紧力。( )
根据我国《消费者权益保护法》的规定,消费者和经营者发生消费者权益争议时,可以通过以下哪些途径解决?
某工程的施工合同工期为16周,项目监理机构批准的施工进度计划如图2所示(时间单位:周)。各工作均按匀速施工。施工单位的报价单(部分)见表5。工程施工到第4周时进行进度检查,发生如下事件。事件1:A工作已经完成,但由于设计图样局部修改,实际完成的工程量
下列支出项目中,不适宜用成本—效益分析法衡量经济效益的是()。①基本建设支出;②国际支出;③交通支出;④教育支出
在协调所有者与经营者矛盾的方法中,接收是一种通过所有者来约束经营者的方法。()
根据增值税法律制度的规定,下列关于增值税纳税义务发生时间的规定,说法正确的有()。
下列天文学常识中,错误的一项是()。
国会:议员
在我国占比重最大的城市类别是( )。1990至1995年中,增长速度最快的城市类别是( )。
A、Sheiswandering.B、Sheisthinking.C、Themanshouldwashtheclothes.D、Shehasalreadywashedtheclothes.C题目询问女士的话是什么意思。对
最新回复
(
0
)