首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
Not long ago, Barack Obama was hoping that high-speed trains would provide America with the desired benefits. First, building th
Not long ago, Barack Obama was hoping that high-speed trains would provide America with the desired benefits. First, building th
admin
2021-09-17
47
问题
Not long ago, Barack Obama was hoping that high-speed trains would provide America with the desired benefits. First, building the special tracks and locomotives would put a division or two of America’s army of unemployed back to work. Then, once built, the trains would get people out of cars and planes and to their destinations in a way that would be cleaner and use less foreign oil. But those dreams have mostly died. Republicans have decided that government spending, not outdated infrastructure, is the real problem, and Republican governors in Florida, Wisconsin and Ohio have rejected federal money to begin building.
Only in California does the dream live on. As Governor Jerry Brown, aged 73 and a Democrat, likes to remember, another big railway project in the 19th century connected the young state to the rest of America. Of late, he has compared his state’s planned high-speed train to the Panama and Suez canals.
California’s voters used to agree. In a 2008 ballot measure, they approved $9 billion in bonds to fund just such a train. As advertised, it was to connect the two big population centres, Los Angeles and the San Francisco Bay area. The project was to cost $33 billion and be completed as early as 2020.
Then the iron law of infrastructure projects asserted itself. According to current estimates, the train would in fact cost three times as much or more, and take 13 years longer to build. Mr. Obama still wants to help; he has asked Congress for $35 billion in railway funding over five years, of which $3.5 billion may go to California. But even with the bond funds, those dollops would cover less than 13% of the estimated cost. Republicans are in no mood to allocate more.
It gets worse. After the ballot measure, it was decided that construction should begin not in the two population centres but in the vast and flat farmlands of the Central Valley, where building is much easier. A highspeed train would then run through sparsely populated countryside, with hardly anybody riding it. Some call this a "train to nowhere" , others
a white elephant
. Using a rather more original metaphor Richard White, a professor of history at Stanford, calls it "a Vietnam of transportation: easy to begin and difficult and expensive to stop" .
The high-speed train was finally planned to begin in_____.
选项
A、the big population centres
B、the San Francisco Bay area
C、the sparsely populated countryside
D、the vast and flat farmlands
答案
D
解析
细节题。根据关键词begin in及出题顺序可将答案定位在第五段。由文中it was decided that construction should begin not in the two population centres but in the vast and flat farmlands of the Central Valley可以判断D项“广阔平坦的耕地上”为正确答案。
转载请注明原文地址:https://kaotiyun.com/show/041Z777K
0
考研英语一
相关试题推荐
【F1】Itistheworld’sfourth-most-importantfoodcrop,aftermaize,wheatandrice,whichprovidesmorecalories,morequickly,
AsGilbertWhite,Darwin,andothersobservedlongago,allspeciesappeartohavetheinnatecapacitytoincreasetheirnumbers
Finally,otherpeoplemaygiveusinstrumentalsupport—financialaid,materialresources,andneededservices—thatreducesstres
Thequickadoptionoftheschememayhaveindicatedlessaboutthestatelawmakers’respectforworkingpeoplethanaboutafear
BernardBailynhasrecentlyreinterpretedtheearlyhistoryoftheUnitedStatesbyapplyingnewsocialresearchfindingsonthe
BernardBailynhasrecentlyreinterpretedtheearlyhistoryoftheUnitedStatesbyapplyingnewsocialresearchfindingsonthe
Twenty-sevenyearsago,EgyptreviseditssecularconstitutiontoenshrineMuslimshariaas"theprincipalsourceoflegislation
Theprovisionofpositiveincentivestoworkinthenewsocietywillnotbeaneasytask.【F1】Butthemostdifficulttaskofall
SowhyisGooglesuddenlysointerestedinrobots?That’sthequestioneveryone’saskingafteritemergedthismonththatthein
随机试题
背景:某工程业主与监理单位签订了施工阶段监理合同,与承包方签订了工程施工合同。施工合同规定:设备由业主供应,其他建筑材料由承包方自行采购。施工过程中,发生如下事件:事件一:施工过程中,承包方未与监理工程师沟通,订购了一批钢材,钢材运抵
如果在建模过程中,希望将做好的实体模型以参数化的方式保留一个副本,正确的操作方法是:
社会主义实行按劳分配的前提条件是()。
肘关节脱位常为
蛋白质二级结构是指分子中A.氨基酸的排列序列B.局部主链的空间构象C.亚基间相对的空间位置D.每一原子的相对空间位置E.每一氨基酸侧链的空间构象
桥梁体系中,()是大跨桥的主要形式。
A注册会计师负责对甲公司20×7年度财务报表进行审计。在确定进一步审计程序的性质、时间和范围时,A注册会计师遇到下列事项,请代为作出正确的专业判断。在确定进一步审计程序的性质时,A注册会计师应当考虑的主要因素有()。
虎山长城遗址除一号台址发现很少的残砖之外,其他地方均没有发现城砖。虎山村及附近村庄也没有从长城上拆下城砖用于民房建筑的情况。由此可以推测,虎山长城用砖是极少的。上述推测还需要隐含哪一项假设?()
根据下列材料回答问题。2011年,河北省各市的公共图书馆、注册护十、医院和卫生院数量均排在前五位的市有几个?()
概念改变中涉及的迁移有
最新回复
(
0
)