首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
One of the components of The Southside Poverty Alleviation Project which was implemented in 2012 was the improvement on the East
One of the components of The Southside Poverty Alleviation Project which was implemented in 2012 was the improvement on the East
admin
2015-08-26
71
问题
One of the components of The Southside Poverty Alleviation Project which was implemented in 2012 was the improvement on the East and West Collet Canal Streets. Everyone can remember the unpleasant state of these streets and the canal which ran in the center. At the completion of the project there was no denying the practical and aesthetical improvement in these areas. It was like day and night: the difference was obvious.
The section most transformed was the area that spans the length of the West Collet Canal from Cemetery Road to Dean Street. This section was used by taxi drivers in front of the Novelo’s bus terminal and by produce vendors in front of the Michael Finnegan Market. The project allowed for taxi and private motor vehicle parking and in an innovative move the construction of business booths over the canal which has been lined with concrete.
This truly is an inspiring venture as it promotes and encourages entrepreneurship. This is something that we don’t have enough of. While this is surely encouraged it has been observed that one such business has placed barricades(路障)on the street in front of its entrance. This defeats the entire purpose of the rehabilitation of the Canal Streets which was to provide much needed parking space. Placing these barriers on the street itself deprives motorists of parking and in effect creates traffic problems in the area.
If history is our guide it is then accurate to assume that the next step which will be taken by this business is a waterproof canvas expansion...you guessed it, onto the street. This would mean that we would be back to square one. We will have the same problem we had in the beginning where vendors spread their produce on the street along the canal. It is therefore imperative that the relevant authorities take note and apply whatever corrective measure is needed to curb this immediately. Belize is transforming for the better. Let’s keep it that way.
According to the author, what is an unwise decision about the area that spans the length of the West Collet Canal from Cemetery Road to Dean Street?
选项
A、Permission for private vehicles to park in the area.
B、Covering up the surface of the canal with concrete.
C、Blocking up the entrance of this special area.
D、Encouraging vendors to do business in the area.
答案
D
解析
推断题。由题干中的the West Collet Canal from Cemetery Road to Dean Street先定位至第二段,继而扩展到第三段。第三段分析了商亭的存在可能会导致的实际问题,说明可能会导致拥堵,无法实现该地区的停车功能,因此,[D]为答案。
转载请注明原文地址:https://kaotiyun.com/show/5jXK777K
0
专业英语四级
相关试题推荐
OnNewYear’sEve,therewillbeafirework_____atPeople’sSquare.
Dozensofpeoplewerearrestedfor______racistpamphletstotheaudience.
ThepeoplethatplantotakeSportsAdministrator’scoursehaveto______.
ThepeoplethatplantotakeSportsAdministrator’scoursehaveto______.
Thefinancialanalysisprojecthastobefinishedby
Therenewableenergyindustryhasdismissedas"trumped-upnonsense"anattackbyDonaldTrumponScottishwindenergyprojects.
Theexperts______onthecauseofpovertybutagreeonstepstoeradicateit.
随机试题
设z=xsiny,求dz。
关于肝细胞癌的MRI表现,错误的是
对热力管道焊缝质量的检验有()等几种方法。
出票人在付款人处的存款足以支付支票金额时,付款人应当在()足额付款。
公共物品供给的资金提供方式是联合融资时,政府常以()方式鼓励私人机构提供公共物品。
加强公安教育训练的正规化建设,就要统一训练标准,即()制定训练标准。
在我国,非法人组织的类型包括
“风定花犹落,鸟鸣山更幽”,此诗句体现了运动和静止的关系是
在UML的各种视图中,(45)显示外部参与者观察到的系统功能;(46)从系统的静态结构和动态行为角度显示系统内部如何实现系统的功能;(47)显示的是源代码以及实际执行代码的组织结构。
Computershavebeentaughttoplaynotonlycheckers,butalsochampionshipchess,whichisafairlyaccurateyardstickformeas
最新回复
(
0
)