首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Problem Description of the Flood Early Warning System Vocabulary and Expressions physically-based algorithm deploy
Problem Description of the Flood Early Warning System Vocabulary and Expressions physically-based algorithm deploy
admin
2018-06-10
50
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse
The scientists have developed statistical algorithms capable of offline, distributed computation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…we are working on statistical algorithms capable of…”判断,offline为错误,故本题表述错误。
转载请注明原文地址:https://kaotiyun.com/show/71rO777K
本试题收录于:
CATTI三级口译综合能力题库翻译专业资格(CATTI)分类
0
CATTI三级口译综合能力
翻译专业资格(CATTI)
相关试题推荐
Shynessisthecauseofmuchunhappinessforagreatmanypeople.Shypeopleareanxiousandself-conscious;thatis,theyaree
Shynessisthecauseofmuchunhappinessforagreatmanypeople.Shypeopleareanxiousandself-conscious;thatis,theyaree
WhatadifferenceKathleenmadeinmycollegelife!ShewasconfidentwhereIwasshaky.ShewasdisciplinedwhileIwaswild.S
Thequestionofwhatchildrenlearnandhowtheyshouldlearnitiscontinuallybeingdebatedandredebated.Nobodydaresanylo
MyFirstExperiencewithAIDSPatients我初次接触艾滋病人byMarcKielburgerIw
Hewasputin______chargeof______reeducationoflaid-offworkers.
AfterfouryearsinAmerica.hegot______.
Legislation,LawsuitsCoverBothSidesonSame-sexMarriage法律,在同性婚姻问题上诉讼两边不得罪Incourtroomsandstatecap
Government政府Governmentisthepoliticalsystembywhicha(1)orcommunityisadministeredandregulated.Mostof(2)k
Itisclearthatwearerapidlybecomingaglobalculture.Newformsofinformationtechnology,intercontinentaltravel,andthe
随机试题
根据我国《专利法》,申请专利的发明创造在申请日之前6个月内具有下列情况之一的不丧失新颖性,这些情况包括()
以下关于粘结力的说法哪项是错误的
出院护理错误的做法是( )。
参加应急预案评审的人员可以是()。
下列属于经济周期的先行指标的是( )。
甲公司20×2年1月1日发行1000万份可转换公司债券,每份面值为100元、每份发行价格为100.5元,可转换公司债券发行2年后,每份可转换公司债券可以转换4股甲公司普通股(每股面值1元)。甲公司发行该可转换公司债券确认的负债初始计量金额为100150万元
公安部是边境旅游的主管部门,负责制定边境旅游有关政策和管理办法,对边境游进行宏观管理,批准承办边境旅游的旅行社。()
操作系统的功能是()。
斯巴达克
对于一个正常运行的C程序,以下叙述中正确的是
最新回复
(
0
)