首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
54
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
What does "vanity" mean?
选项
A、Emptiness.
B、Fair for cosmetic.
C、Dining table.
D、Door.
答案
B
解析
转载请注明原文地址:https://kaotiyun.com/show/9WKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtotheman,whatchangewillbemadetothecompany?
Whatdepartmentdoesthespeakermostlikelyworkin?
Whatdepartmentdothespeakersmostlikelyworkin?
Whatdepartmentdothespeakersmostlikelyworkin?
Whichdepartmentdoesthespeakerspecificallythank?
Task9TrainingOverseasExpansionTheRetailCompanyyouworkforintendstoexpandintoforeignmarketsandneedstotrainloc
Task6IncreaseinOrdersThemanufacturingcompanyyouworkforhasexperiencedasuddenincreaseincustomerordersandiscon
Strongcomplaints强硬投诉
TaskSheetforCandidateATaskSheet1A:Themanagement:theimportanceofcorporatecultureB:Customerrelations:howtoget
Youwillheararadioprogrammeonthesubjectofinnovation,researchanddevelopmentinbusiness.Foreachquestion(23-30)
随机试题
混合关税
我国第一次将中等教育列入学校系统的现代学制是()
多重PCR电泳产生的一条对照条带或多数不规则的条带判断结果为
与雌激素增加有关的肝硬化,可见与血氨升高有关的肝硬化,可见
刘教授1998年1月1日自行将我国刚颁布的一部法律译成英文,投递给《中国法坛》,于1998年6月1日发表。国家有关机关认为刘教授的译文质量很高,经与刘协商,于1998年12月5日发文将该译文定为官方正式译文。刘教授对其译文( )。
某机电安装工程项目,业主通过公开招标方式选择了某机电安装企业,双方签订了机电安装工程施工总承包合同,施工总承包企业又选择了一家劳务分包企业,将某分部工程的劳务作业分包给该劳务分包企业。在施工过程中发生如下事件:事件1:由于业主供应的工程材料延误,使
阅读下列材料,并回答问题。李老师是某中学小有名气的数学老师。他备课非常认真,自己对课上和作业里的每道题都事先演练,课堂讲解清晰明确,教学效果良好,课外作业坚持全批全改,发现作业有错误就要求学生订正并罚抄10遍,每次测试都进行细致的质量分析,及时在班上公布
如果所有的鸟都会飞,并且企鹅是鸟,那么企鹅会飞。从这个前提出发,需要加上下列哪一项前提,才能逻辑地推出“有些鸟不会飞”的结论?
操作系统能找到磁盘上的文件,是因为有磁盘文件名与存储位置的记录。在OS/2中,这个记录表称为()。
NATOforeignministersaremeetinginLithuania
最新回复
(
0
)