首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Complete the notes below. Write ONE WORD ONLY for each answer. Hydropower Renewable—constant source (31) from natural
Complete the notes below. Write ONE WORD ONLY for each answer. Hydropower Renewable—constant source (31) from natural
admin
2012-01-16
77
问题
Complete the notes below.
Write ONE WORD ONLY for each answer.
Hydropower
Renewable—constant source (31) from natural hydrologic cyde
(32) —90% of hydro energy→electricity
Clean—no air or (33) pollution
(34) & curable—simple to operate
Flexible—can start
adapt quickly to meet demand→leads to (35) of power supply.
Welcome to our series on renewable resources. The topic today is hydropower. As you most probably know, ’hydro’ means water—so we are talking about using water to generate electricity. Of course, there are many ways to generate electricity but hydropower is important to the community, firstly and obviously, because it’s renewable. The earth’s hydrologic cycle of constant evaporation and transpiration provides a continual supply of water from rainfall and snowmelt. The second point to consider is its efficiency. Hydropower plants are able to convert approximately 90% of the energy from the falling water into electric energy whereas many fossil-fuelled plants lose more than half of the energy content of their fuel by way of waste heat and gases. For this reason they are very efficient.
Hydropower is also clean. It doesn’t emit harmful gases that contribute to air pollution, acid rain, and global warming. No trucks, trains or pipelines are needed to bring fuel to the site and there’s no noise pollution either. Furthermore, hydropower plant machinery is fairly simple and runs at slow speeds, which makes it reliable and durable. And, hydropower units are flexible also—they have the ability to start quickly and adjust rapidly to changes in demand for electricity, thus enabling them to meet peak loads. But this also allows them to serve as reserve capacity and bring more stability to the power system overall.
The dams that provide hydroelectric power also have other uses such as navigation, flood damage reduction, water supply, recreation, irrigation and low flow augmentation but it’s not the purpose of this talk to go into those details.
How do the hydropower plants work? Well, a dam is built across a river which captures water to form a reservoir and raises the water level to create ’head’. Think of ’head’ as the vertical distance that the water falls as it passes through the dam, in other words, the difference in water level between the reservoir behind the dam and the river below. Water from the reservoir flows through an intake gate into a penstock—this is kind of a narrow channel which leads to the turbine below. The force of the water causes the turbine to rotate rapidly which, in turn, drives the generator to spin and produce electricity. The electricity is carried the long distances from the powerhouse to substations on the outskirts of cities via power lines.
Can you build a hydropower unit on any river? Well, no, just having water in a river isn’t enough. A good dam site must have enough stream flow as well as enough head. A fast flowing river on the plains is probably not suitable because a dam couldn’t be built high enough to provide the head needed for efficient production of electricity. On the other hand, dams in arid high country may have plenty of head but insufficient stream flow. The perfect spot for a hydropower plant is where the right combination of stream flow and head exists.
What about the environment? Surely the construction of large dams has an environmental impact? Well, yes it does. Certainly dams and reservoirs are built to improve the lives of people living in towns, farming communities and cities. But there must be a balance between development and preserving the natural environment. Needless to say, the natural river environment is changed which leads to changes in river ecology and aquatic habitat. Sometimes, for example, dissolved oxygen levels below dams get so low in summer that there is a negative impact on aquatic life. These levels can be improved, however, by using special aerating turbines and/or injecting oxygen directly into the stream flow. In order to protect and improve the habitat for endangered and other species of birds, fish and water life, there needs to be a thorough review of operating plans to see if a better balance can be achieved.
Hydropower plant design and operation must not only meet the needs of consumers for electricity but work hand-in-hand with agencies whose concern is for the fish and wildlife, water quality and water supply.
选项
答案
reliable
解析
转载请注明原文地址:https://kaotiyun.com/show/TjAO777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
Inmathematics,judgmentsaboutthevalidityofproofsaremediatedbypeer-reviewedjournals,toensure______,reviewersarec
Manyresearchersattributethelargenumberofphysiologicalandbehavioralsimilaritiesbetweenbirdsandmammals,whichhaves
ThecontroversyaboutAlexandertheGreat’spersonalityderivesfromthefactthatoursourcesare(i)________,alleyewitnessa
Abird’splumage,whilecontributingtostructuralintegrityandparticipatinginaeriallocomotion,completelyobscuresabird’
Thenaturalbalancebetweenpreyandpredatorhasbeenincreasingly____,mostfrequentlybyhumanintervention.
Frenchfolktalesalmostalwaystakeplacewithinthebasic(i)____thatcorrespondtothe(ii)____settingofpeasantlife:ont
Massiveprojectilesstrikingmuchlargerbodiescreatevariouskindsofcraters,includingmulti-ringbasins–thelargestgeologi
Wouldyousayemployersarepayingmoreattentiontoworkers’healththanbefore?
ThechartshowshouseholdsavingsasapercentageofincomeforpeoplelivinginHongKong.Summarisetheinformationbyselecti
WhyGirlsNeedtoSwitchontoComputingThegardeniscomingalongnicely.Flowersspringintobloomintheherbaceousborders;
随机试题
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andcool.FoxPointisaspankingnew47-unit【C1】_______
______hisappearance,hecomesfromawell-offfamily.
冲脉交会任脉交会
下列哪项是修建性详细规划针对的地区()
会计科目是对会计对象的具体内容进行初始分类的标志,报表会计要素是对会计对象的具体内容进行终结分类的标志。()
本例中的加工贸易合同,在进口前应向海关办理的备案手续是______。加工贸易合同履行完毕后,经营单位应该持哪些单证到大连海关办理合同核销手续______。
《合同法》规定,自债务人的行为发生之日起( )年内,债权人没有依法行使撤销权的,该撤销权消灭。
当组织人力资源出现结构性失衡时,正确的供需平衡方法是()。
[2014年12月]已知M=(an+…+an—1)(a2+…+an),N=(an+…+an)(a2+…+an—1),则M>N。(1)a1>0;(2)a1an>0。
[x]表示不超过x的最大整数,试确定常数a的值,使存在,并求出此极限.
最新回复
(
0
)