首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The best-seller wooden toy among our products is【D1】________,which is designed for【D2】________.Our output per month is 4,000 ite
The best-seller wooden toy among our products is【D1】________,which is designed for【D2】________.Our output per month is 4,000 ite
admin
2021-03-06
58
问题
The best-seller wooden toy among our products is【D1】________,which is designed for【D2】________.Our output per month is 4,000 items, and the average【D3】________ time per box is 5 minutes.We have 1,000 boxes in storage, and the next dispatch will come on November third.Currently, we have 20 drivers and 40 staff working on the【D4】________.All staff do【D5】________ work.
【D1】
Well, the next product 1 want to move onto is children’ s toys.In this part of building, we manufacture several different wooden toys.But the greatest demand is for our train sets.These are made up of ten pieces and each piece is a different color.It’ s a toy for the under-fives and it sells well.We manufacture 1,000 of these every week.That’s a total production of 4, 000 a month.Over here, we put all the toys into boxes.Because this is a product for young children, everything has to be very carefully checked beforehand.So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country.Orders are not constant, but go up and down depending on what time of the year it is.So we try to keep about 1,000 boxes in storage at any one time.That’ s the number that we have at the moment anyway.As I said, we deliver our children’ s toys to stores around the country.Outside, we’ re just loading up the lorries which are going to set off tomorrow.That’ s November third.Then there won’ t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines.As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’ re working.
选项
答案
train sets
解析
根据录音中的“But the greatest demand is for our train sets”可知,该企业卖得最好木制玩具产品是火车组,故填train sets,表示“火车组”。
转载请注明原文地址:https://kaotiyun.com/show/U9AK777K
本试题收录于:
C类竞赛(非英语专业本科)题库大学生英语竞赛(NECCS)分类
0
C类竞赛(非英语专业本科)
大学生英语竞赛(NECCS)
相关试题推荐
ThisisMattDrudge,millionairefounderandowneroftheDrudgeReport,thefirstandmostsuccessfulonline’newspaper’.Peop
Thesedays,collegelecturehallsintheUnitedStatesarebeingfilledmoreandmorewithfemaleratherthanmalestudents.Wom
In2004,aHarvardstudentnamedMarkZuckerbergdecidedthatheneededawaytokeeptabsonhisschoolmatesovertheInternet
Whendochildrenstarttotalk?Ifyouaskagroupofparentswhenthishappened,mostwillsay"aroundtwelvemonthsofage".Th
TheMcDonald’srestaurantswerestartedbytheMcDonald【D6】_________.Theywantedtogivepeoplequick,easyandcheapmeals.Th
Itiswellknownthatsomeculturesprefersonstodaughters.Incontrast,surveyshaveadaughterthanason.Apparently,each
Children’sToysMostpopularwoodentoy:【D1】______Thewoodentoyisfor【D2】______Outputper【D3】______:4,000itemsAverage【D4】
_________shouldnotbecomeaseriousdisadvantageinlifeandwork.
Reportshaverecommendedthatuniversitiesandcollegesshouldprizegoodteaching__________goodresearch.
随机试题
儿童视觉发育的关键期为()
黄风村毗邻松花河,村民以养鱼为生。凯南石化要扩建,将厂址选在黄风村松花河中游,并在村民的强烈要求下修建管道将污水废气排走以防污染松花河。2005年夏天,凯南石化突然发生爆炸,不久以后松花河下游村民发现所养的鱼一夜之间全部死光。原来是石化厂爆炸后的废水废气流
下面所列工程建设定额中,属于按定额编制程序和用途分类的是()。
某机电安装工程项目开工之前,承包方向监理工程师提交了施工进度计划如图2H320060一8所示,该计划满足合同工期100d的要求。在上述施工进度计划中,由于工作E和工作G共用一个塔式起重机(塔式起重机原计划在开工第25天后进场投入使用),必须顺序
用于裂缝防治的玻纤网和土工织物应满足()等技术要求。
某企业为增值税一般纳税人,应收账款的会计处理采用总价法,2009年12月份发生了下列货币资金与应收项目的业务:(1)公司的出纳员交来因上个月工作错误,由本人赔偿的现金500元。(2)企业计算出本月应付各类人员的工资数额为:生产A产品工人
某汉字的区位码是5448,它的国际码是
Rockswhichhavesolidifieddirectlyfrommoltenmaterialsarecalledigneousrocks.Igneousrocksarecommonlyreferredtoasp
Patents,saidThomasJefferson,shoulddraw"alinebetweenthethingswhichareworthtothepublictheembarrassmentofanexc
Manystudentsfindtheexperienceofattendinguniversitylecturestobeaconfusingandfrustratingexperience.Thelecturersp
最新回复
(
0
)