(2006) The cost of the project was much higher than our_____estimate.

admin2014-02-01  41

问题 (2006) The cost of the project was much higher than our_____estimate.

选项 A、accurate
B、frank
C、rational
D、original

答案D

解析
转载请注明原文地址:https://kaotiyun.com/show/dWFC777K
本试题收录于: 英语题库普高专升本分类
0

最新回复(0)