Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the U
Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the U
admin
2017-03-25
37
问题
Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the United States. Although their duties vary from plant to plant, industrial production managers share many of the same major responsibilities. These responsibilities include production scheduling, staffing, procurement and maintenance of equipment, quality control, inventory control, and the coordination of production activities with those of other departments.
The primary mission of industrial production managers is planning the production schedule within budgetary limitations and time constraints. They do this by analyzing the plant’s personnel and capital resources to select the best way of meeting the production quota. Industrial production managers determine, often using mathematical formulas, which machines will be used, whether new machines need to be purchased, whether overtime or extra shifts are necessary, and what the sequence of production will be. They monitor the production run to make sure that it stays on schedule and correct any problems that may arise.
Industrial production managers also must monitor product standards. When quality drops below the established standard, they must determine why standards are not being maintained and how to improve the product. If the problem relates to the quality of work performed in the plant, the manager may implement better training programs, reorganize the manufacturing process, or institute employee suggestion or involvement programs. If the cause is substandard materials, the manager works with the purchasing department to improve the quality of the product’s components.
Because the work of many departments is interrelated, managers work closely with heads of other departments such as sales, procurement, and logistics to plan and implement company goals, policies, and procedures. For example, the production manager works with the procurement department to ensure that plant inventories are maintained at their optimal level. This is vital to a firm’s operation because maintaining the inventory of materials necessary for production ties up the firm’s financial resources, yet insufficient quantities cause delays in production. A breakdown in communications between the production manager and the purchasing department can cause slowdown and a failure to meet production schedules. Just-in-time production techniques have reduced inventory levels, making constant communication among the manager, suppliers, and purchasing departments even more important. Computers play an integral part in this coordination. They also are used to provide up-to-date information on inventory, the status of work in progress, and quality standards.
Production managers usually report to the plant manager or the vice president for manufacturing, and may act as liaison between executives and first-line supervisors. In many plants, one production manager is responsible for all aspects of production. In large plants with several operations, there are managers in charge of each operation, such as machining, assembly, or finishing.
To meet the production quota, it is of vital importance that______.
选项
A、every machine be utilized to its fullest capability
B、problems be corrected at once whenever they arise
C、work shifts be arranged to yield the highest productivity
D、the optimal staffing and budgeting arrangement be made
答案
D
解析
本题的依据句是第二段中的“They do this by analyzing...the production quota.(他们经过分析工厂人事情况和资金来源,完成生产定额)”。据此可知D项为正确答案。其他三个选项是选择最佳方式时的具体的工作,而不是关键所在。
转载请注明原文地址:https://kaotiyun.com/show/mKGO777K
0
考博英语
相关试题推荐
ThetwoclawsofthematureAmericanlobsteraredecidedlydifferentfromeachother.Thecrusherclawisshortandstout;thec
Wemusttrytouseourintellect______.
Inrecentyearstherehasbeena______increaseinthecostofliving,manyfamilieshavetodependonthefederalaids.
Inolddays,whenaglimpseofstockingwaslookeduponassomethingfartooshockingtodistracttheseriousworkofanoffice,
Thinkaboutwhatwouldmakeyoureally,reallyhappy.Moremoney?Wrong.Smiling,well-adjustedkids?Wrongagain.Thefactisw
Asshehasakindly,outgoingnature,sheisa_____hostessandhasawidecircleofverygoodfriends.
【T1】Determinedtomakeitonhisown,Bushdidnottellhisfatherthathewas’applyingtoHarvardBusinessSchool.【T2】The"Wes
Asshehasakindly,outgoingnature,sheisa_____hostessandhasawidecircleofverygoodfriends.
ThewildlifeinAfricaisextremely______.
随机试题
女性,55岁。上腹部被汽车撞伤2小时,剧烈腹痛,伴恶心呕吐,神志淡漠,查体:P135次/分,BP75/45mmHg,全腹有压痛、反跳痛及肌紧张,移动性浊音可疑阳性,肠鸣音减弱。首选的诊断方法是
低密度脂蛋白(LDL)的主要功能是
不符合血小板无力症的检查结果的是
下列在瘢痕修复过程中最重要的是()。
当双代号网络计划的计算工期等于计划工期时,下列关于关键工作的说法错误的是( )。
背景资料:某二级公路工程K30+200~K30+500,地势平坦,路基断面形式为路堤,路堤边坡高度平均22.3m,路基填料为2公里外的路堑挖方,调运过来填筑,拟采用机械化施工。施工单位施工组织设计中路基填筑的施工方案如下:(1)土质分析:借土土
隧道软弱围岩地段施工时,Ⅴ级围岩初期支护仰拱封闭位置距离掌子面不应大于()m。
根据房产税法律制度的规定,下列各项中,符合规定的有()。
注意事项1.本题本由给定资料与作答要求两部分构成。考试时限为150分钟。其中,阅读给定资料参考时限为40分钟,作答参考时限为110分钟。满分150分。2.监考人员宣布考试开始时.你才可以开始答题。3.请在题本、答题卡指定位置填写自己的姓名,填涂准考证
根据以下资料,回答问题。根据国家统计局对全国31个省(区、市)的抽样调查和农业生产经营单位的全面统计,2012年全国粮食总产量58957万吨,比2011年增产1836万吨。2012年,全国粮食播种面积111267千公顷,比2011年