首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Removing Dams P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factor
Removing Dams P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factor
admin
2018-10-18
47
问题
Removing Dams
P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factory watermills, and other purposes that allowed farming on lands that would otherwise be too dry, with low-cost hydroelectric power generation being a very significant side benefit. Building these dams was rather labor-intensive, which created jobs for workers and stimulated regional economic development. But those opposed to large dams can marshal a sobering array of criticisms based on those already built, which have provided some benefits but have without exception destroyed river environments and the human communities that depend on them.
P2: Many, perhaps most, of the more than 90,000 dams in the country are now obsolete, expensive, and unsafe, and were built with no consideration of the environmental costs. As operating licenses come up for renewal in 1999, habitat restoration to original stream flows will be among the options considered. As these dams age and decay, they can also become public safety hazards, presenting a failure risk and a dangerous nuisance. Worse still, with the growth of the American population, more people are moving into risky areas. Dams that once could have failed without major repercussions are now upstream of cities and development. In 1998, the Army Corps announced that it would no longer be building large dams. In the few remaining sites where dams might be built, public opposition is so great that getting approval for projects is unlikely.
P3: For many years, the United States Fish and Wildlife Service had advocated the removal of the Edwards Dam, which was built in 1837 on the Kennebec River in Augusta, Maine, to ease navigation and generate electricity. The Kennebec River was once home to all ten species of migratory fish native to Maine, along with several thriving commercial fisheries. Damming the river not only transformed the natural landscape, but it also prevented migration of salmon, shad, sturgeon, and other fish species up the river.
In 1999, the Federal Energy Regulatory Commission (FERC) refused the renewal of the dam license due to excessive negative environmental impact, and the dam was removed, freeing a 17-mile stretch of the Kennebec River that had been submerged for 162 years. P4: The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits.
P5: When the negative environmental effects outweigh the benefits, a dam may be considered for removal. The Hetch Hetchy Dam, whose construction was one of the first major defeats of the nascent American environmental movement, was approved in 1913 to assist earthquake-ravaged San Francisco. Environmentalists and nature lovers, who said the valley’s beauty surpassed even Yosemite Valley’s, have constantly fought for its removal. They claim that restoring Hetch Hetchy Valley could reclaim an area that is half the size of Yosemite Valley and nearly identical in terms of beauty. Revenue and increased local spending from tourism could offset some or all of the losses from removing the dam. This problem can be thought of as appraising the relative value of two scarce resources, water and space, in Yosemite National Park.
P6: How does one weigh the many different economic, cultural, and aesthetic considerations for removing or not removing these dams? Do certain interests, such as the rights of native people or the continued existence of native species of fish or wildlife, take precedence over economic factors, or should this be a utilitarian calculation of the greatest good for the greatest number? And does that number include only humans, or do other species count as well?
P4: ■ The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. ■ This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. ■ Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. ■ Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits.
According to paragraph 2, the likelihood that new dams will be built has decreased because
选项
A、construction costs have increased enormously
B、safety standards have become much higher
C、public opposition to dam construction has increased
D、at most suitable sites an existing dam would have to be removed first
答案
C
解析
【事实信息题】末句提到少数可能建大坝的地方的民众也非常反对,所以建造大坝的可能性变小了。
转载请注明原文地址:https://kaotiyun.com/show/qwfO777K
0
托福(TOEFL)
相关试题推荐
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.BirminghamexhibitionExampleAnswerPur
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.BirminghamexhibitionExampleAnswerPur
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.NOTESONISLANDHOTELExampleAnswerTyp
Completethenotesbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.NOTESONISLANDHOTELExampleAnswerTyp
Completethetablebelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.Talkingaboutthehistoryofbikes
Listentothedirectionsandmatchtheplacesinquestions11-15totheappropriateplaceamongA-Eonthemap.HealthCentre
Completethenotesbelow.WriteNOMORETHANTWOWORDSforeachanswer.HistoryofweatherforecastingE
Completethenotesbelow.WriteONEWORDONLYforeachanswer.EffectsofurbanenvironmentsonanimalsIntroductionRecenturba
WriteNOMORETHANTWOWORDSAND/ORANUMBERforeachanswer.MonarchButterfliesHibernationButterflyspeciesadoptdifferent
Cementisproduced(commercially)by(toheat)amixtureoflimestoneandclay(ina)large,(slowlyrotating)cylindricalfurnac
随机试题
彩色多普勒血流显示蓝色时表示
某企业预计明年销售收入将达到6000万元,总成本费用将为5600万元,该企业明年应缴纳()。
影响基坑稳定性的说法,不正确的是()。
某制药设备机电安装工程项目,监理单位要求总承包商编制并提交该工程施工组织设计,总承包商首先确定了该工程的总体施工流程,继而编制了施工组织设计并提交监理工程师。总承包商在施工过程中出现以下情况:(1)制药设备由厂家将其分解成零部件运输到安装施工现场。(2
逻辑数据独立性是指()。
以下属于《新巴塞尔资本协议》内容的是()。
下列关于学前美术教育活动的目标陈述中,符合行为目标取向的是()
关系R(A,B,C)和S(C,D,E)进行关系代数运算,下列各关系表达式中成立的是(30)。关系模式P(A,B,C,D,E,P,G,H,I,J)满足下列函数依赖;FD={ABD→E,AB→G,B→F,C→J,CJ→I,G→H},FD的最小函数依敕集
Hisgreatsuccess______(与其说在于运气不如说靠努力).
Ifyou’reinchargeofChristmasdinner,withallitsinterconnectedtasksandchallengesoftiming—whentopreheattheoven,wh
最新回复
(
0
)