首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The Greeks have a second Battle of. Marathon on their hands. Their adversaries this time are not invading Persians, as in 490 B.
The Greeks have a second Battle of. Marathon on their hands. Their adversaries this time are not invading Persians, as in 490 B.
admin
2014-06-02
62
问题
The Greeks have a second Battle of. Marathon on their hands. Their adversaries this time are not invading Persians, as in 490 B. C. , but environmentalists and archaeologists in growing numbers. They are closing ranks in opposition to plans to build a water sports complex at the historic battleground for use during the 2004 Olympics in Athens.
Opposition to the construction has been gaining strength in Greece and the rest of Europe since the plans were announced more than a year ago. After standing back from the controversy at first, American archaeologists are now speaking out against the project as a threat to the site of one of the most decisive battles in antiquity.
In the current issue of Archaeology, a magazine of the Archaeological Institute of America, Dr. Nancy C. Wilkie, the organization’s president, called on colleagues "to join in the effort to preserve this important historic and natural site."
Dr. Wilkie said the battlefield needed to be preserved because even after all this time, the plain, where the outnumbered Athenian army defeated the Persians, and the adjacent wetlands, where many Persian soldiers perished, "have yet to be fully investigated by archaeologists."
Environmentalists challenged the decision to create two artificial lakes for the rowing and canoe and kayak competitions, a grandstand and other buildings in the area of the coastal wetlands. They said the construction would not only intrude on the battle site but would endanger the wetlands, which are a haven for 176 species of birds and many rare plants and a vital stopover for migratory birds, including the rare glossy ibis. A number of appeals seeking to stop the construction are before an administrative court.
Defending the construction, .Greek Olympic organizers insisted that Marathon was hardly a pristine landscape. Summer tourists flock to the Skinias beach, where the Persians are thought to have landed, and parts of the plain are already altered with farms and villages. The organizers noted, that one of the lakes would replace an old airstrip. Their plans also include protection for the wetlands as a national park.
"It is impossible to create something like Waterloo or Gettysburg in this area," George Kazantzopoulos, environmental program manager for the Olympic organizers, has said. "It is already ruined.
But Dr. Dorothy King emphasized the intangibles of the issue. "The importance of the site is as much in its symbolism—it would be the equivalent of putting a theme park in the middle of the site of the Battle of Gettysburg."
Promoters of the construction have argued that the actual battlefield would not be affected because parts of what is now considered the site, including the Sehinias beach, were three to six feet beneath the sea in antiquity.
But Dr. Wilkie, in her editorial, noted that a geological study conducted under the auspices of the American School of Classical Studies in Athens contradicted such claims. By drilling bore holes to a depth of 26 feet across the plain, geologists determined that the topography was little changed since the battle. The site for the proposed water sports center, the research showed, was not beneath the sea 2,500 years ago.
But international pleas and recent protests at Marathon have so far left the Olympic organizers unmoved. While work on the $ 44 million project continues, they have defended the construction as possibly the best thing that could happen to Marathon. It is, they said, a way to rescue the site from earlier unplanned and often shabby development.
Environmentalists and archaeologists, fearing that the project would instead attract more commercial development, said they were not ready to give up the fight and, like the defeated Persians, flee to their ships.
The construction might produce the following harmful effects EXCEPT ______.
选项
A、destroying a historic battleground
B、greatly reducing Greece’s tourist income
C、ruining a natural stopover for migratory birds
D、making further archeological investigation impossible
答案
B
解析
转载请注明原文地址:https://kaotiyun.com/show/ewpO777K
0
专业英语八级
相关试题推荐
LyricsandCriticalLiteracyIhaveorganizedmyexamplesintothefollowingsixtopics:TheEnvironment:TracyChap
EffectiveAssignmentsUsingLibraryandInternetResourcesFacultymemberscanfacilitatestudents’developmentasseekersa
Disneyland’sHistoryWaltDisneyhadavisionofaplace,amagicparkwherechildrenandparentscouldhavefuntogether.T
HigherEducationinChinaNowadays,thereformanddevelopmentofhighereducationhavemadesignificantachievements.Highe
WiththeclosureofWorldExpo2010inShanghai,manypeoplearestillarguingtheimpactofhostingWorldExpoontheblending
Beowulfwaswrittenin_____.
Nowthetrumpetsummonsusagain--notasacalltobeararms,thougharmsweneed;notasacalltobattle,thoughembattledw
"Ifwintercomes,canspringbefarbehind?"isanepigrammaticlineby______
IwaswalkingthroughthevillageSaturdaynight.Partofmystrolltookmeacrossthenewlycompletedbridgethatbindstogethe
随机试题
一例脓肾患者,使用多种抗生素及理疗后,病情仍较重,但对侧肾脏情况不了解,下一步治疗应
磁共振成像中对血流信号影响不大的因素是
到2010年,城乡新增建设用地占用耕地的增长幅度要在现有基础上力争减少20%;在城镇化过程中,重点是统筹城乡空间布局,实现城乡建设用地总量的()。
对于中、小型立式或卧式轴流泵,进水池(或水源)水位变幅较大且地下水位较高时可建()。
根据以下资料回答下列题:甲企业于2011年10月成立,因经营规模较小,拟不设置会计机构,将会计工作委托新兴财务咨询公司代理。新兴财务咨询公司于2011年9月成立,并通过工商行政部门核准登记,负责人贾某为持有会计从业资格证书的高级会计师,另有l0名
Tempo公司在一道联合工序上生产三种产品。因为在分离点任何一种产品都没有市价,三种产品需进一步加工后才能出售。每批的联合成本为$315000。其他信息如下所示:若公司采用可实现净值法来分配联合成本,则会分配多少联合成本至每件C产品?
在物业拍卖活动中出现的价格有()。
下列天气现象中,一般号快行冷锋活动有关的是()。
中国经济近些年来出现了明显不同于前30年的特征,经济增速持续下滑,自2010年至2012年经济增速已经连续11个季度下滑,2012年和2013年的GDP年增速连续两年低于8%。与此同时。我国商业银行的贷款利率、存款利率和同业拆借利率却均维持在高水平。国家的
Successinschooloratwork____________(与其说是靠天资,还不如说是靠勤奋)
最新回复
(
0
)